Installation Guide
25
(310) 935-0028support@streamlinebath.comstreamlinebath.com
At the back of the range hood, right below the mounting holes, there
will be 2 visible holes (1 on each side). These are additional safety holes to
help secure the range hood in position.
1. Use a 5/16’’ [8mm] drill bit to make pilot holes in the cabinet at the
marked locations. For wood, use a 5/32'' drill bit.
2. Fasten the range hood using (2) ST4*30 screws.
3. Tighten the four initial mounting screws that you drilled into the
cabinet.
26.
For ductless installation ONLY: Attach the provided charcoal filters onto
the range hood motor. For detailed instructions on how to insert the
charcoal filters, please see Section 11 on page #45.
27.
Re-insert either the mesh or baffle filters into the range hood.
28.
Drill
1 2 3