Installation Guide

22
(310) 935-0028support@streamlinebath.comstreamlinebath.com
Hang the range hood back onto the mounting bracket. Make sure that
the range hood aligns with the 2 previously drilled holes.
18.
Use a drill to make two holes in the wall at the marked locations. For
wood, use a 5/32'' drill bit, and for wall anchors, use a 5/16'' drill bit.
If mounting directly to a wood stud, use the (2) provided ST 4x30
mounting screws to secure the mounting bracket in place by drilling (2)
pilot holes.
If mounting to the wall, use the (2) provided wall anchors prior to
installing the (2) ST 4x30 mounting screws. Insert the plastic wall
anchors firmly into the drilled holes.
17.
Drill
Plastic
Anchors