Product Manual
7
3. Line up the handle to the handle socket located on the side of the jack, then insert the handle inside the
handle socket.
4. Secure the handle in place inside the handle socket. Without any weight on the jack, cycle the lift up and
down several times to insure the hydraulic system is operating properly. (Perform to the Air Purge
Procedure before first use.)
SYSTEM AIR PURGE PROCEDURE
IMPORTANT: BEFORE FIRST USE
Perform the following Air Purge Procedure to remove any air that may have been introduced into the hydraulic
system as a result of product shipment and handling. This step is to be completed without any weight on the
jack.
1. Turn release valve counterclockwise on full turn to the open position.