Installation Sheet

Site Preparation 5
subzero.com/specs
Before You Start
M
ake sure the opening dimensions, door clearance,
electrical service and plumbing are correct for the model
you are about to install. Refer to specifications on the
following pages.
IMPORTANT NOTE: To operate properly, the door must
open a minimum of 90°. Use a minimum 3"
(76) filler in
corner installations to assure a 9 door opening. Allow
enough clearance in front of the unit for full door swing.
TOOLS AND MATERIALS REQUIRED
Appliance dolly able to support 130 lbs (59 kg)
Level 2' (.6 m) and 4' (1.2 m) recommended
Phillips and slotted screwdriver sets
Wrench set and allen wrench set
Crescent wrenches
Various sized pliers
5
/16" hex bolt nut driver
Drill and assorted drill bits
Model UC-24CI—4'
(1.2 m) of
1
/4" copper, braided
stainless steel or PEX tubing and saddle valve for
water line (do not use self-piercing valves).
Model UC-24CI—Tubing cutter.
Masonite, plywood,
1
/8" pressed fiberboard, cardboard
or other suitable material to protect finished flooring