Instruction Manual

10
Read the manual carefully before use. Better understanding
means better and safer spreading. For English follow the symbol.
GB
CONTENTS
English
Pages
START-UP
13
12-13
14-15
14-15
• A Preparing the machine
• B Handling
• C Hitching
• D Vertical setting
Pages
SETTINGS
20-29
30-33
34-35
36-37
• A Setting the flow
• B Markers
• C Depth control
• D Adjusting the covering
harrow
Pages
MAINTENANCE
53
52-53
53
54-55
56-57
58-59
• A Maintenance
• B Lubrication
• C Checks
• D Distribution
• E Technical specifications
• F Sticker positions
14-15
16-17
16-17
18-19
• E Parking support
• F Hydraulics
• G Electrics/Electronics
• H Filling the seed box
Pages
SETTING CHARTS
66
66-95
• A Pre-setting reminder
• B Seeding rate charts
38-39
40-49
50-51
50-51
• E Adjusting the track
eradicators
• F Tramlining
• G Disengaging half of the
seed drill
• H Emptying the seed box
Pages
ACCESSORIES
60-61
60-61
62-63
64-65
• A Depth limiter
• B Uniband share
• C MS flow rate modulation
• D Areameter