Installation Guide

adjust the way and place, screw down the control water body’s lockup nut, make it fix on the
basin. At last install back the handle according to the remove step.
: The control water body with the red sign installs on the left and connects with hot water;
with blue sign install on the right and connects with cold water.
Step3 Put the O-ring wash under the faucet body, adjust the place, from under the basin, put on
the G 3/4” black washer, then screw on the nut, connect the triple tube to the nipple. Then
connect the two inlet hoses separate with the two control water body.
Step4 Two inlet hoses separate connect with the angle valve and two control water body, left
control water connect with hot water, right control water connect with cold water.
Step5 Open water source, check all connect point is leakage.
: To the five hose bathtub faucet, connect the faucet body and the shower to the shunt
valve.
Warning:
1) Water pressure must ensure more than 0.05 MPA.
2) Must according left hot, right cold to connect.
3) When using, open cold water first then open hot water.
A4 Pull out kitchen faucet
Please connect the150cm pull out water pile with the faucet head and add weight ball on the
pipe before you connect faucet with water supply. Other installation steps please reference to
A1.
A5 Wall Mount Faucet
1. Refer to the faucet size, dig the faucet body conceal hole and cold, hot water pipe conceal
hole on the wall.
2. Remove the spout, handle, cover and so on from the conceal body.
3. Fix the inner wall, connect with cold, hot water pipe and open water source, confirm no
leakage.
4 Then cover spout, handle and other component according to the remove step to install back,
screw down screw to fix all component.
6/8