Installation Guide

5 6
GENERAL INFORMATION: Pool must be stored if temperatures are expected to fall below 32°F.
A. All parts should be cleaned with a mild soap and lukewarm water only - DO NOT use detergent or hot water.
B. Make sure all parts are dry before storing to help prevent mildew from forming.
C. Store all parts in a dry heated area where temperatures do not go below 32° F or above 125° F.
D. Failure to follow the proper storage instructions could cause damage to pool parts and void warranty.
E. YOU MUST FOLLOW THE ASSEMBLY INSTRUCTIONS TO REASSEMBLE YOUR POOL NEXT SEASON. Pool site
must be cleared and leveled again before setting up your pool.
DRAINING THE POOL:
A. To drain the pool, locate the drain plug on the outside of the pool wall and remove the drain cap. A standard
garden hose will thread onto the drain fitting. Extend the hose to the area where the water is to be drained.
When you have placed the garden hose where desired, the drain plug on the inside of the pool can be opened.
B. Remove any remaining water as you wash and completely dry pool using a soft cotton cloth. Push the drain
plug into the fitting and replace the cap.
C. Frame Pools: If your pool has metal frame work, disassemble those pieces by depressing the plastic buttons
sliding those pieces apart or by removing the plastic pins holding them together again sliding those pieces
apart, clean them and wipe them dry. If in doubt of proper disassembly refer to the pools set-up sheet and
reverse those steps. Place them all together in a safe storage place for reassembly next season. Order replace
ment parts for any damaged, broken, or worn parts.
D. Solar blankets, leaf covers, ladders, etc., should be cleaned and dried before storing.
D. Once the top frame is assembled, locate the Vertical Legs (94). The Vertical Leg sections will have a Spring Pin
(95) pre-installed at the top end. First, insert the leg down through the belt that runs around the middle of the
pool, see Fig. 4. Now, to connect them into the top frame, push the buttons in as you insert the Leg up into the Tee
Fitting. Look through the hole in the Fitting as you insert and rotate the pipe until the buttons align with the holes
and pop out, locking the leg in place. Finally, take one of the Leg Caps (96) and insert the bottom of the Vertical
Leg into it until it stops.
E. Go around and check all of the Fittings, Legs, and Beams for proper fit, making sure that all the Pins have been
securely fastened in all of the holes. Grab the Vertical Legs at the bottom and gently pull them out making sure
that they remain vertical and perpendicular to the top ring.
F. Make sure the drain fitting is plugged securely and the cap is in place. Start filling the pool with water.
NOTE: AFTER ABOUT 1-INCH OF WATER IS ON THE BOTTOM, STOP FILLING AND SMOOTH WRINKLES OUT OF THE
BOTTOM OF THE POOL MAKING SURE THE POOLS BOTTOM IS FLAT AND ROUND EQUALLY IN ALL DIRECTIONS.
SEE FIG. 4 BELOW
G. NOTE: IF MORE THAN 1-2 INCHES OF WATER COLLECTS ON ANY ONE SIDE BEFORE THE POOL STARTS FILLING IN
THE CENTER, THE POOL IS NOT LEVEL ENOUGH, AND MUST BE CORRECTED, SEE “SITE PREPARATION”, PAGE 4.
NOTE: THE WEIGHT OF THE WATER WILL PREVENT ANY ADJUSTMENT AFTER THIS POINT.
H. Continue to check the Vertical Legs and pull them out at the bottom if necessary, making sure they remain
vertical and perpendicular to the top ring.
I. Following the instructions under “Power Filter Installation” in the “Swimming Pool Filter System” owner’s manual,
begin installing your power filter unit according to it’s manual.
3 DISASSEMBLY AND STORAGE
Should you encounter any problems, contact the Customer Service at (888) 919-0070.
Extended operating days and hours during peak season requirements.
Should you encounter any problems, contact the Customer Service at (888) 919-0070.
Extended operating days and hours during peak season requirements.
C. When you get to the last connection, install the last Tee Fitting on
the end of one of the beams. Lift up on both of the last two Beams
in order to get them to insert into the Tee Fitting. Angle them towards
each other and guide the Beam into the Fitting as you lower them
both down together. See Fig. 2. This step may require two people.
Now, begin inserting the Pins (93) / Grommets (97) down through
the top of the Tee Fittings until the Pin snaps into place on the lower
side of the Fitting as shown in Fig. 3.
FIG. 3
93
97
96
FIG.4
FLOOR MUST BE FREE OF WRINKLES AND ROUND
EXTENDING OUT TO EACH VERTICAL LEG SUPPORT
94
95
92
93
97
96
94