Instruction Manual

3-6
SECTION 3 – OPERATION
FIELD OPERATION
1. Rephase cylinders before starting eld operation.
2. Choose a at spot in a eld to set tillage depth and level machine.
3. Determine desired tillage depth by working test strips within the eld.
IMPORTANT!
The operator is responsible for adjusting machine since machine does not come “Field
Ready” from factory.
NOTE: Optimum performance of machine is achieved by tilling at a depth and moving at a
speed that does not go beyond limit of trip assemblies. This limit is exceeded if connecting
bolt (shown in the following drawing) continually rides above trip assembly cap.