Use & Care
10 
2. Install the beer tower assembly and the mixed ball valve: 
a) Plug the beer tower assembly into the top cover of the beer dispenser: 
3.0” tower: This does not require a tower  
buckle. Put beer tower directly over the  
hole at the top of the beer dispenser’s  
upper surface. Fix the beer tower assem- 
bly with screws directly on the upper sur- 
face of the beer dispenser. (See Fig. 3). 
2.5” tower: This requires the tower buckle.  
Place the beer tower at the hole in the upper surface of the beer dispenser at an 
inclination of 60°, and rotate 60° clockwise along the card slot. Be sure the tap is facing 
toward the front of the machine. Attach the beer tower with washers (See Figure 4). 
b) Take out the accessories of the mixed ball valve. Attach the transparent hose to the beer 
outlet of the mixed ball valve (See Figure 5). 
3. Install CO
2
 gas cylinder and CO
2
 regulator valve: 
a) Fix the two CO
2
 hose clamps on the red  
CO
2
 tube (See Figure 6). 
b) Connect the ends of the red CO
2
 tube  
respectively to the CO
2
 intake port of the  
mixed ball valve and the round outlet of  
the CO
2
 regulator valve. Lock these  
connections firmly with the two clamps on 
the red CO
2
 tube (See Figure 7). 
c) Using the wrench, tighten the CO
2
 regulator table valve with the hex nut port to the gas 
outlet of the CO
2
 tank (See Figure 8). 
d) Place the CO
2
 tank and CO
2
regulator valve component into the  
cabinet and fix the CO
2
 tank 
with tank bracket and bolt (See  
Figure 8).
CO
2
 regulator  
valve 
Safety switch 
Red CO2 tube 
Bracket and retainer  
of CO
2
 tank 
Regulating  
table 
CO
2
 gas 
cylinder 










