Instructions / Assembly

INSTALLING THE SUN-MAR DRY TOILET
- 5 –
Placement
Of The
SUN-MAR
Dry Toilet
Installing
The
SUN-MAR
Dry Toilet
Base
The
Transition
Piece
Ensure that the floor joists are not in the way and that there is an unobstructed 10”
diameter passage from the underside of the AF “Dry Toilet” to the top of the transition
piece. The 10” hole should be centered 11.5” (29.21 cm) from the back wall and at least
9” (22.86 cm) dry toilet from the side wall in the room where the toilet will be installed.
The transition piece on the top of the composting unit should be located so that the
center line of the transition piece is directly below the center of the 10” circular cutout
which will be made in the bathroom floor above. The transition piece should be at a right
angle to the composting unit.
The SUN-MAR Dry Toilet comes preassembled. For the purpose of
explanation, the toilet base is the bottom of the toilet which is
secured to the bathroom floor, the toilet chute is the black inner
section (shown in Fig. A) that fits through the floor and is attached
to the toilet top, the toilet top is the upper part of the toilet that
attaches to the toilet base, and the bowl liner which is the black
removable funnel shaped piece below the toilet seat.
To install the SUN-MAR Dry Toilet, follow the procedure outlined
below:
1. To locate the position of the SUN-MAR Dry Toilet, place the toilet
chute in the desired location on the floor in the bathroom and
trace the 10”(25 cm) diameter cut out in the bottom of the toilet
base on the floor in the bathroom. The centre of the 10” circle
should be centered 11.5” (29.21 cm) from the wall against which
the toilet will be mounted(See Fig. A)
2. Drill a 1/2”(6mm) hole on the front of traced line and then check
under the floor that the hole will be clear of floor joists and will
line up with the composting unit below. (See Fig. B)
3. If the position is correct, complete the cutting of the10”(250mm)
diameter circle with a jig saw. (See Fig. C)
4. Center the toilet base over the 10”(250mm) diameter hole that
Has been cut out of the floor and securely attach to the floor by
using the four 5/16” by 2 1/2”(8mm by 64mm) lag bolts that are
provided with your kit. (See Fig. D)
**Prior to finishing the SUN-Mar Dry Toilet installation, it is a good
Idea at this time to do a pre-assembly check to see if you will
need any extension pipe.
Place transition piece (Fig. E) into the rectangular opening on the
top of the composting unit. Make sure that the transition piece is
completely vertical on the unit, or completely vertical. Important: the
transition piece should be completely vertical. The opening in the
toilet in bathroom should be oriented above the opening in the
transition piece so that waste can drop directly into the patented
bio-drum.

Summary of content (2 pages)