Server User Manual
Table Of Contents
- Sun Netra™ CP3250 Blade Server User’s Guide
- Contents
- Figures
- Tables
- Preface
- Overview
- Hardware Installation and Service
- 2.1 Safety and Tool Requirements
- 2.2 Installing the Blade Server
- 2.3 Service Procedures
- 2.3.1 Hot-Swapping the Netra CP3250 Blade Server
- 2.3.2 Powering Off the Netra CP3250 Blade Server
- 2.3.3 Removing the Netra CP3250 Blade Server
- 2.3.4 Powering On the System
- 2.3.5 Automatic Power-Off Events
- 2.3.6 Servicing DIMMs
- 2.3.7 Installing the Optional Compact Flash Card
- 2.3.8 Installing Optional AMC
- 2.3.9 Adding or Replacing the Battery
- 2.3.10 Changing Jumper Settings
- 2.3.11 Checking DIP Switch Settings
- 2.3.12 Resetting the Netra CP3250 Blade Server
- Hardware Architecture
- Software Configuration
- Configuring and Using BIOS Firmware
- 5.1 About BIOS Settings
- 5.2 Changing the Configuration of a BIOS Menu Item
- 5.3 Setting the Boot Device Using BIOS Setup Screens
- 5.4 Setting Supervisor and User Passwords
- 5.5 Resetting the System Time and System Date
- 5.6 Updating the BIOS
- 5.7 Secondary BIOS Image
- 5.8 Perform a Live Firmware Upgrade
- 5.9 Power-On Self-Test
- 5.10 Changing POST Options
- BIOS Screens
- Physical Characteristics
- ShMM CLI and Commands
- Index

Chapter 2 Hardware Installation and Service 2-3
The other end of the antistatic wrist strap lead should be connected to one of the
following:
■ A ground mat
■ The chassis metal as a ground
The grounded mat or the chassis must be connected to a facility ground to
prevent a floating ground.
■ Keep blade servers in the antistatic bags until they are needed.
■ Remove a blade server from its antistatic bag only when wearing a properly
connected ground strap.
■ Place circuit blade servers that are out of their antistatic bags on an antistatic mat
if one is available and the mat is grounded to a facility electrical service ground.
Do not place blade servers on top of an antistatic bag unless the outside of the bag
also has antistatic protective properties.
2.1.2 Materials and Tools Required
The tools required for installation and service are as follows:
■ Phillips screwdrivers: No. 1 (required), No. 2 (optional)
■ Antistatic wrist strap
■ Terminal console
■ Serial cable of less than 10 meters in length to connect the Sun Netra CP3250
blade server with a system console
Refer to Section 1.6, “System Components” on page 1-11 for information on
hardware requirements.