Computer Accessories User Manual
STARTING THE VTL APPLIANCE
316196101 • A Chapter 1 Installing VTL Value hardware 23
1. To apply standby power and start the service processor, plug the two VTL appliance
power cords in to grounded, 200-240 VAC power outlets.
The startup process begins. It may take up to 58 seconds. When the service processor is up
and the system is standing by, the OK LED on the front panel (
A below) blinks, as does the
Enclosure Status OK LED on the system controller (
B).
A
B










