Server User Manual
Table Of Contents
- Sun Fire™ X2250 Server Service Manual
- Contents
- Preface
- Sun Fire X2250 Server Overview
- Troubleshooting
- Performing Diagnostics
- 3.1 Pc-Check Diagnostics Overview
- 3.2 System Information Menu Options
- 3.3 Advanced Diagnostics Tests Menu Options
- 3.4 Immediate Burn-in Testing
- 3.5 Deferred Burn-in Testing
- 3.6 Create Diagnostic Partition Option
- 3.6.1 Removing Existing Partitions From a Hard Disk
- 3.6.2 Adding a Diagnostic Partition to the First Bootable Disk
- 3.6.3 Creating a Log File on the Diagnostic Partition
- 3.6.4 Accessing the Diagnostic Partition on a Red Hat Linux System
- 3.6.5 Accessing the Diagnostic Partition on the Solaris 10 Operating System
- 3.6.6 Accessing the Diagnostic Partition on the Windows Server 2003 Operating System
- 3.7 Show Results Summary
- 3.8 Print Results Report
- 3.9 About Pc-Check
- 3.10 Exit to DOS
- Maintaining the Sun Fire X2250 Server
- 4.1 Tools and Supplies Needed
- 4.2 Installation Precautions
- 4.3 Powering Off the Server and Removing the Cover
- 4.4 Locations of Server Components
- 4.5 Component Replacement Procedures
- 4.5.1 Replacing the I/O Board
- 4.5.2 Replacing the PCIe Card and Riser Assembly
- 4.5.3 Replacing a Hard Disk Drive and Carrier
- 4.5.4 Replacing an HDD Backplane Assembly
- 4.5.5 Removing and Installing the ODD Drive Assembly
- 4.5.6 Replacing the Air Duct
- 4.5.7 Replacing the Power Supply
- 4.5.8 Replacing the Single Fan Module
- 4.5.9 Replacing the Dual Blower Module
- 4.5.10 Replacing Memory Modules
- 4.5.11 Replacing the System Battery
- 4.5.12 Replacing a CPU and Heatsink
- 4.5.13 Installing a New CPU
- 4.5.14 Replacing Cables
- 4.5.15 Motherboard
- System Specifications
- Using the Tools & Drivers CD
- Installing the Server Into a Rack With Optional Slide Rails
- C.1 Disassembling the Slide Rails Before Installation
- C.2 Installing the Mounting Brackets Onto the Server
- C.3 Attaching the Slide-Rail Assemblies to the Rack
- C.4 Installing the Server Into the Slide-Rail Assemblies
- C.5 Installing the Cable Management Assembly
- C.6 Verifying Operation of the Slide Rails and CMA
- Index

C-1
APPENDIX
C
Installing the Server Into a Rack
With Optional Slide Rails
Perform the procedures in this chapter to install your server into a four-post rack
using the orderable slide rail and cable management arm options. These slide rails
are compatible with a wide range of equipment racks that meet the following
standards:
■ Four-post structure (mounting at both front and rear). Two-post racks are not
compatible.
■ Rack horizontal opening and unit vertical pitch conforming to ANSI/EIA 310-D-
1992 or IEC 60927 standards.
■ Distance between front and rear mounting planes of 610 mm and 915 mm (24
inches to 36 inches).
■ Clearance depth (to front cabinet door) in front of front rack mounting plane at
least 25.4 mm (1 inch).
■ Clearance depth (to rear cabinet door) behind front rack mounting plane at least
800 mm (31.5 inches) with the cable management arm, or 700 mm (27.5 inches)
without the cable management arm.
■ Clearance width (between structural supports and cable troughs) between front
and rear mounting planes at least 456 mm (18 inches).
Caution – Always load equipment into a rack from the bottom up so that it will not
become top-heavy and tip over. Deploy your rack’s anti-tilt bar to prevent the rack
from tipping during equipment installation.
Caution – Ensure that the temperature in the rack does not exceed the server’s
maximum ambient rated temperatures. Consider the total airflow requirements of all
equipment installed in the rack, to ensure that the equipment is operated within its
specified temperature range.