Server User Manual
Table Of Contents
- Sun Fire™ X2250 Server Service Manual
- Contents
- Preface
- Sun Fire X2250 Server Overview
- Troubleshooting
- Performing Diagnostics
- 3.1 Pc-Check Diagnostics Overview
- 3.2 System Information Menu Options
- 3.3 Advanced Diagnostics Tests Menu Options
- 3.4 Immediate Burn-in Testing
- 3.5 Deferred Burn-in Testing
- 3.6 Create Diagnostic Partition Option
- 3.6.1 Removing Existing Partitions From a Hard Disk
- 3.6.2 Adding a Diagnostic Partition to the First Bootable Disk
- 3.6.3 Creating a Log File on the Diagnostic Partition
- 3.6.4 Accessing the Diagnostic Partition on a Red Hat Linux System
- 3.6.5 Accessing the Diagnostic Partition on the Solaris 10 Operating System
- 3.6.6 Accessing the Diagnostic Partition on the Windows Server 2003 Operating System
- 3.7 Show Results Summary
- 3.8 Print Results Report
- 3.9 About Pc-Check
- 3.10 Exit to DOS
- Maintaining the Sun Fire X2250 Server
- 4.1 Tools and Supplies Needed
- 4.2 Installation Precautions
- 4.3 Powering Off the Server and Removing the Cover
- 4.4 Locations of Server Components
- 4.5 Component Replacement Procedures
- 4.5.1 Replacing the I/O Board
- 4.5.2 Replacing the PCIe Card and Riser Assembly
- 4.5.3 Replacing a Hard Disk Drive and Carrier
- 4.5.4 Replacing an HDD Backplane Assembly
- 4.5.5 Removing and Installing the ODD Drive Assembly
- 4.5.6 Replacing the Air Duct
- 4.5.7 Replacing the Power Supply
- 4.5.8 Replacing the Single Fan Module
- 4.5.9 Replacing the Dual Blower Module
- 4.5.10 Replacing Memory Modules
- 4.5.11 Replacing the System Battery
- 4.5.12 Replacing a CPU and Heatsink
- 4.5.13 Installing a New CPU
- 4.5.14 Replacing Cables
- 4.5.15 Motherboard
- System Specifications
- Using the Tools & Drivers CD
- Installing the Server Into a Rack With Optional Slide Rails
- C.1 Disassembling the Slide Rails Before Installation
- C.2 Installing the Mounting Brackets Onto the Server
- C.3 Attaching the Slide-Rail Assemblies to the Rack
- C.4 Installing the Server Into the Slide-Rail Assemblies
- C.5 Installing the Cable Management Assembly
- C.6 Verifying Operation of the Slide Rails and CMA
- Index

Appendix C Installing the Server Into a Rack With Optional Slide Rails C-9
Caution – Verify that the server is securely mounted in the rack and that the slide-
rails locks are engaged with the mounting brackets before continuing.
C.5 Installing the Cable Management
Assembly
Use this procedure to install an optional cable management assembly (CMA).
1. Unpack the CMA parts.
2. Take the CMA to the back of the equipment rack and ensure that you have
adequate room to work around the back of the server.
Note – References to “left” or “right” in this procedure assume that you are facing
the back of the equipment rack.
3. Locate the CMA rail extension and insert it into the left slide rail until the
extension locks into place with an audible click. (See
FIGURE C-7.)
The CMA rail extension might be taped to the CMA assembly.










