Installation Guide

SIZE INFORMATION
M, CMA MODELS
Fastener Schedule
Size
Code
Roof
Opening
Finished
Opening
(Drywall
Dimension)
Fits on
Center
Spacing
Fasteners
Per
Top
Per
Btm
Per
Side
1446 14½"x46½" 13½"x45½" 16" 2 2 4
2236 22½"x36½" 21½"x35½" 24" 3 2 3
2246 22½"x46½" 21½"x45½" 24" 3 2 4
3030 30½"x30½" 29½"x29½" 16" or 32" 3 2 3
3046 30½"x46½" 29½"x45½" 16" or 32" 3 2 4
1284 SA2 - 3/12
SIZES 1446, 2236, 2246, 3030, 3046
MODEL SFA
Minimum 2:12 pitch required.
Sun-Tek Manufacturing, Inc.
10303 General Drive
Orlando, FL 32824
407 / 859-2117
www.Sun-Tek.com
CustomerService@Sun-Tek.com
INSTALLATION INSTRUCTIONS
POLYDOME SERIES
LIGHT TUNNEL INSTALLATION INSTRUCTIONS
For homes with an attic, it is necessary to build a tunnel between skylights and ceiling. The tunnel walls may be straight, or ared for extra light and
architectural appeal. Its very easy to increase the tunnel size along the length of the ceiling joists. As long as no roof-supporting members are cut, no
special framing is needed. While it is possible to are the tunnel in all directions, if support members are cut, special framing will be required for structural
support. In this case you must consult a qualied building professional to insure proper and safe results.
1 After roof and ceiling openings have been framed, measure distance (at each corner of roof
opening) between rafter/truss and ceiling joist.
2 Using these four measurements, cut 2 x 4 lumber for vertical support members (two per corner).
3 In each corner, nail vertical support members into place at right angles to each other.
4 Measure, cut, and nail tunnel walls into place. Suggestions for lining tunnel:
- use drywall, tape corners, and paint white using regular or texture paint. (Texture paint alone
will hide and ll untaped joints, but in time, cracks may appear in corners.)
- use prenished paneling with molding in corners.
- line the tunnel with cedar, pine, or a wood to coordinate with your decor.
- for special eects, try painting the tunnel a striking accent color, or use mirrors or wallpaper on
tunnel walls.
5 Caulk the slight gap between the tunnel walls and skylight base.
6 Finish o tunnel at ceiling with molding, or blend edges into ceiling with texture paint.
7 Be sure to wrap the exterior of the tunnel with insulation for energy savings.
POLYDOME SKYLIGHT LIMITED WARRANTY
Sun-Tek Manufacturing, Inc. ("Sun Tek") 10303 General Drive, Orlando, Florida 32824, (407) 859-2117, warrants this Skylight on the following terms and conditions: A. Warranty Coverage: This warranty applies to both the original
purchaser and rst consumer-owner of a Skylight made by Sun-Tek. B. Warranty Duration: This warranty shall remain in eect for a period of ve (5) years on Model SF and ten (10) years on all other Dura-Series models after the date
the Skylight is purchased or the date the skylight is delivered to the rst consumer-owner, whichever is later. One (1) year on electric components.
C. Warranty Application: This warranty applies only to the materials and fabrication of the Skylight and does not apply to any defect or damage caused by improper use, improper installation, improper care, shipping damage or ac-
cident. This warranty does not cover any cosmetic changes in skylight, including but not limited to pitting, hazing, paint nish, discoloration. Condensation or damaged caused by condensation is not covered under this warranty. D.
Performance by Sun-Tek: During the warranty period, Sun-Tek will provide free of charge an equivalent new skylight (or component thereof) for one found to be defective in material or workmanship. Shipping costs of such replace-
ments are not the responsibility of Sun-Tek. Sun-Tek will not be responsible for any costs of removal or re-installation. E. Validation Procedure: To obtain performance under this warranty, the purchaser must: (1) On installed skylights,
contact Sun-Tek for instructions before removing skylight. Removal of skylight from roof before inspection will void warranty. (2) Notify Sun-Tek in writing of any claim within thirty (30) days after the defect is discovered; (3) Sun-Tek
or its authorized agents must examine high quality installed photographs of the subject skylight and determine to its satisfaction whether the defect is covered by this warranty ; and (4) Present a copy of the receipt as proof of purchase. F.
Implied Warranties: IMPLIED WARRANTIES, INCLUDING BUT NOT LIMITED TO IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, SHALL NOT EXTEND BEYOND THE DURATION OF THE EXPRESS
WARRANTIES PROVIDED HEREIN. Some states do not allow limitations on how long an implied warranty lasts, so the above limitation may not apply to you. G. Incidental or Consequential Damages: SUN-TEK SHALL NOT BE LIABLE FOR
ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES WHATSOEVER, INCLUDING BUT NOT LIMITED TO LOSS OF TIME OR REVENUE, DAMAGE RESULTING TO OTHER PROPERTY OR OTHER EXPENSES. Some states do not allow the exclusion
or limitation of incidental or consequential damages, so the above limitation or exclusion may not apply to you. H. Exclusive Warranty: THIS WARRANTY IS EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES. This warranty gives you
specic legal rights. You may have other rights which vary from state to state.
All installation information is supplied in good faith, but without recommendation to its use. No guarantee of the results of any use of this
information is to be implied, since conditions of use are beyond our control. Please consult local building codes for compliance before installing.
You will need:
• hammer • sealant/mastic
• keyhole saw • tape measure
• skill saw • chalkline or straight edge
• nails • trowel or caulk gun
• drill • utility knife
• 2 x 4’s
For Light Tunnel:
• 8 or 10 penny nails
• plywood or drywall
RECOMMENDED SEALANTS:
100% Silicone
Sealants approved for use on
polycarbonate (contact Sun-Tek
STS 1000 (Sun-Tek exclusive) Butyl rubber
sealant/caulk
Please read instructions completely before beginning.
Deck and roong felt should already be installed.
1 Inspect skylight for damage before installing. Peel back
protective plastic to inspect dome. If skylight is damaged, do
not install. Please contact your supplier for information on a
replacement.
2 To properly position skylight between trusses/rafters, locate the
roof opening from the underside of the decking. Drill holes or
drive nails to mark corners. (If this area is not accessible, locate
the ceiling joists from inside the house, mark and cut opening in
ceiling, then mark roof opening.)
3 Remove shingles 6 - 8" out from roof opening.
Before cutting roof opening, check measurements against size
chart. Snap a chalkline from corner to corner, or draw line with a
straightedge, then cut roof opening.
4 Frame roof opening using 2 x 4’s as headers - cut two 2 x 4’s to t
the actual distance between trusses/ rafters and nail into place.
a) If applicable, cut ceiling opening and build tunnel framing.
See “Light Tunnel Installation Instructions.”
FAILURE TO FOLLOW RECOMMENDED INSTALLATION PROCEDURES MAY VOID WARRANTY
4
CLEANING YOUR SKYLIGHT:
Use a mild glass cleaner (such as Glass Plus) and a clean sponge or soft cloth. Fresh paint splashes, glazing compound, etc. may be removed before
drying by rubbing lightly with a soft cloth or cotton ball soaked in isopropyl alcohol.
DO NOT use abrasive or highly alkaline cleaners, ammonia, benzene, gasoline, acetone, or carbon tetrachloride. Do not clean skylight in bright sun or
high temperatures. Periodic waxing with a high quality, non-abrasive wax such as Mirror-Glaze will help maintain the good looks of your skylight.

Summary of content (2 pages)