Operating Guide

3
INSTALLATION
Layout and Drilling
1. Determine general location of the display.
2. Use a stud nder to nd the nearest wall stud if applicable and mark their location.
3. Tape template at and level to wall surface, aligning the template’s slots with the stud markings on the wall.
NOTE: Use of a bead level is recommended.
NOTE: Template corners fold up to catch debris.
4. Use a pen or pointed object to mark bore locations.
ATTENTION: Before drilling, verify there is a minimum of 1-3/8" of concrete thickness to be used for the
concrete anchors. Ensure to mount in a solid part of the block, generally 1" minimum from
the side of the block. Cinder block must meet ASTM C-90 specifications.
ATTENTION: Concrete must be 2000 psi density minimum. Lighter density concrete may not hold concrete
anchor.
ATTENTION: A standard electric drill on slow setting should be used to drill the holes instead of a hammer
drill to avoid breaking out the back of the hole when entering a void or cavity.
5. Drill holes in marked locations:
Use 1/4" bit for drilling into wooden studs.
Use 5/16" bit for drilling into concrete wall.
ATTENTION: Be sure to drill holes centered within studs or bricks. Do not drill into mortar joints.
Wall Mounting of Arm Assembly
1. Hammer concrete anchors (V) into wall as applicable.
ATTENTION: If anchors are going to be applied to a plastered concrete wall, the anchor must be recessed
beyond the plaster to reside fully in the concrete.
2. Apply washers (W) to lag bolts (U).
3. Hold Arm Assembly in place while applying lag bolts (U) with washers (W).
NOTE: A properly mounted Arm Assembly will be oriented so that its Keyed Notches side of the Arm Assembly Head
Mount is upward.
4. Tighten bolts (U) snugly without overtightening.
CAUTION: Overtightening can damage the bolts and reduce their holding strength.
Masonry Anchors (V)
(for concrete only)
Head
Mount
1/4" Holes for Studs
5/16" Holes for Concrete
Keyed
Notches
Washers (W)
Lag Bolts (U)
Arm Assembly
Figure 1