Installation Guide

17
Tip left front corner (D) back to vertical position and
align lower tabs on right side with slots in floor.
Shed Assembly/Walls (continued)
1
2
D
15
Align tab on bottom right side of left front corner (D) with
slot on front floor (A). Lower panel into slot and lock in
place by sliding panel toward door opening.
Note: Use a rubber mallet to “push” left front
corner (D) into locked position.
1
2
D
A
13
1
22
D
14
Tip left front corner (D) back to vertical position and
align lower tabs on right side with slots in floor.