Su stai a st eW hat Sunc n a b l e Fu t u Se ASSEMBLY INSTRUCTIONS re BMS7705 Vista™ Storage Shed D ng or e is oi to Ach h i e v e a B ri g te r, M Tools Required #2 7/16” (11.
Register within 90 days of purchase to activate Warranty! Registration is not required for products with a warranty term of 90 days or less. 1. Verify warranty term of your product by visiting www/suncast.com/warranty (products with a warranty term of 90 days or less do not require registration) 2. Complete registration: fill out the form and upload a copy of your receipt by visiting https://support.suncast.
Before You Begin... • Consult your local authorities for any permits required to construct shed. Prior to the construction of your shed, check with the local building code official to review any required permits or building limitations. • A level and sturdy foundation is required before shed construction can begin. Site preparation information is available later in this manual. A foundation that differs from the suggestions within this manual could prevent proper assembly and may damage parts.
Shed Care and Maintenance • At regular intervals, inspect your shed to make sure that assembly integrity has been maintained. • Periodically check that the location you have chosen to set your shed is still level. • Keep roof clean of snow and leaves. • To maintain the look of your product, we recommend cleaning it at regular intervals with mild soap and water. DO NOT use bleach, ammonia or other caustic cleaners, and DO NOT use stiff bristle brushes.
Parts - Walls and Floors IMPORTANT COMPLETE SITE PREPARATION AND FOUNDATION CONSTRUCTION BEFORE UNPACKING ALL PARTS. OPEN ALL BOXES FIRST AND NEATLY LAYOUT PARTS. SMALL PARTS MAY BE CONTAINED IN EACH BOX. PLEASE REFERENCE THE PARTS LIST WITHIN THIS MANUAL TO VERIFY ALL PARTS ARE PRESENT.
Parts - Doors J R 0464845 Left Door 0102593A Door Window P 0440919 Window Gasket x2 K 0464846 Right Door 6
Parts - Headers H 0B00445B Rear Header G 0B00444 Front Header 7
Parts - Roof W 0B00452A Rear Roof Peak L 0B00934 Left Roof x2 Q 0B00443A Front Roof Peak M 0B00935 Right Roof x2 8
Parts - Steel 0464848 - Parts Bag Z U O DD 1MPG00003 Truss Bracket 1MPG00001 Ridge Beam Bracket x2 *0280384 D-Ring x2 *1MPG00004 7 7/8” Truss Strap x2 S EEE X AA Y BB CC 1MRG01010 82 1/4” Ridge Beam 1MRG02001 62” Header Beam 1MRG02002 57” Header Beam 1MRG09012 41” L-Bracket x8 1MRG05004 45 5/8” Truss Leg x2 1MRG04002 40 3/4” Side Adapter x2 1MRG06001 40 5/8” Truss Cross Beam x2 Kit #0860021G 9
Parts - Hardware 0480340 – Hardware Bag 0480374 – Hardware Bag KK .25 - 20 x 1" Hex Bolt x2 JJ .25" x 2" Hex Bolt x4 II 0MP000002 – Metal Hinge Plate x6 0480337 – Hardware Bag OO .25" x .75" Screw x6 0480375 – Hardware bag JJ .25" x 2" Hex Bolt x2 LL NN LL .25" Locking Nut x6 .625" Screw x210 .25" Locking Nut x2 0480452 – Hardware Bag 0480494A - Hardware Bag 0480438 – Hardware bag DDD #8 x .625 Screw x9 RR Easy Bolt 7/8” x31 PP SS .
Parts - Door Handle Kit 0463282 – Door handle kit VV 0102354 Right handle 0480370 – Hardware Bag YY #10 x 1" Fender Washer x4 WW 0102353 Left handle ZZ #10 x 2 1/4" Pan Head Screw x4 Hardware shown at actual size (*unless otherwise noted). Extra hardware provided. Not all are used.
Site Preparation and Platform Construction Materials NOT supplied with Shed Kit Important: • Site preparation is required for this shed. Placing the shed on a properly constructed, square, flat, smooth and level foundation, as described below, is required. Without a properly constructed foundation, settling will eventually occur, causing distortion and damage to the shed. Suncast is not responsible for replacing parts damaged or property lost due to incorrect foundation construction or improper assembly.
Site Preparation and Platform Construction (continued) Materials NOT supplied with Shed Kit Wood platform critical spacing 15 1/2” • Check all critical spacing measurements carefully.
Pre-Assembly - Door Power tools can apply excessive torque resulting in damage to the product. If you choose to use a power drill to assemble the product, Suncast recommends using a variable speed, cordless drill with a variable clutch set at the lowest setting. A #2 Phillips driver bit is compatible with the hardware provided. Suncast makes no guarantee that following this recommendation will prevent damage to the product. Damage to parts due to over-torque are not covered under Suncast’s limited-warranty.
Pre-Assembly - Header 5 U Slide roof ridge beam bracket (U) under tabs on inside peak of front header (G) and secure with two screws (NN). DO NOT over tighten screws. 1 G NN x2 2 6 Lay front header (G) on ground with lettering side facing up. Place front header beam (X, 57") into pocket on inside of front header (G). Attach with six screws (NN). DO NOT over tighten screws. NN x6 1 Repeat for rear header (H) and rear header beam (EEE, 62").
Pre-Assembly - Roof and Truss CAUTION: Wear gloves when handling steel frame parts. 7 Attach truss bracket (Z) to end of one truss leg (Y) with 1" hex bolt (KK) and locking nut (LL). Y Repeat for second truss leg (Y). Y 1 Z x2 KK x2 2 3 x2 LL 8 9 Y Y 1 1 CC Y CC 1 BB LL JJ x2 2 JJ 3 LL x2 3 2 x2 Attach two truss cross beams (CC) to two truss legs (Y) using two hex bolts (JJ) and two locking nuts (LL). Stand truss and check cross beam is level.
Assembly - Walls 10 Push front floor (A) and rear floor (T) panels together and secure with six screws (NN). NN x6 Note: Refer to site preparation earlier in this manual for information about how to secure floors to foundation. T 1 1 A 2 11 Align tab on bottom right side of left front corner (B) with slot on front floor (A). Lower panel into slot and lock in place by sliding panel toward outside of floor. B A 2 1 Note: Use a rubber mallet to “push” left front corner (B) into locked position.
Assembly - Walls (continued) 12 B 1 13 1 B 2 2 Tip left front corner (B) outward slightly and bend corner hinge. Tip left front corner (B) back to vertical position and align lower tabs on right side with slots in floor. Note: You will hear a snap when tab is fully engaged. 14 Before proceeding, make sure corner is square (top view) where it meets the floor and that panel is flush (side view) with floor. If not, repeat Steps 11–13 until square and flush.
15 Align tabs on bottom of side panel (N) with slots along front and rear floors. Lower panel into slots and lock in place by sliding panel toward front corner. N Note: Use a rubber mallet to “push” side panel (N) into locked position. 2 1 16 ecure side panel with four easy bolts (RR), working from S floor to roof. DO NOT use torque wrench. Use easy bolt easy driver (SS) and hand tighten. Easy bolt head will be flush when fully seated. DO NOT over tighten easy bolts.
Assembly - Walls (continued) 17 C D D E N F Hardware Needed RR x24 Repeat Steps 12-16 for remaining panels.
Assembly - Headers and Truss 18 Place front header (G) over door opening and fit two protruding support legs into pockets molded in front corners. Secure front header using two screws (NN) in each front corner. G NN x4 2 19 20 H NN x4 2 NN x8 3 2 Slide truss assembly into place. Secure with four screws (NN) in each side adaptor bracket. Place rear header (H) over back walls and fit four protruding support legs into pockets molded in back walls. Secure rear header using eight screws (NN).
Assembly - Headers and Truss (continued) 22 21 Y 1 S 1 BB DD NN x2 JJ 3 LL 2 2 Raise ridge beam (S) up and into rear roof ridge beam bracket. Secure with one 2" hex bolt (JJ) and one locking nut (LL). Repeat with front ridge beam bracket. Attach truss strap (DD) to side adaptor bracket (BB) and truss leg (Y) with two screws (NN). Repeat for remaining truss strap. Note: Make sure open end of ridge beam faces down.
Assembly - Roof 24 Q 1 1 M 2 TT L UU 3 Place the front roof peak (Q) onto a right roof panel (M). Secure with five rubber washers (UU) and five sealing screws (TT). Repeat for rear roof peak (W) and remaining right roof panel (M). Before proceeding, locate and identify the six slots on interior side of left roof panels (L). Note: Rubber side of washer should be against plastic panel.
Assembly - Roof (continued) 25 1 1 L 2 1 G x3 Before proceeding, locate and identify six front header tabs and six rear header tabs. Lay left roof (L) directly over three tabs on left side of front header (G). With left roof slots seated over/on header tabs, check alignment in all three spots. 26 27 L Y L End view L Y Slide left roof (L) down towards the outside of shed. Press edge of left roof (L) into channel on truss leg (Y).
28 29 Q L 1 M 1 G 1 End view 2 x3 Repeat steps 26-28 for remaining left roof panel (L). Lay right roof (M) with front roof peak (Q) directly over three tabs on right side of front header (G). With right roof slots seated over/on header tabs, check alignment in all three spots. 30 31 Q M 1 M Y 1 End view 1 Front view M Y Press edge of right roof (M) into channel on truss leg (Y). Slide right roof (M) with front roof peak (Q) down towards the outside of shed.
Assembly - Roof (continued) 32 33 W M End view UU x10 TT x10 x6 Push down the right roof panels with roof peaks from outside. From inside shed, secure roof peaks to left roof panels together using 10 rubber sealing washers (UU) and 10 sealing screws (TT). Repeat steps 30-32 for remaining right roof panel (M) and rear roof peak (W). Note: For clarity, illustration is shown with front header removed. 35 34 N F 1 1 3 1 NN x4 2 2 Pull down each lower corner of roof from outside.
37 36 1 1 AA 1 3 NN NN x3 3 AA AA 2 4 2 Secure roof support (AA) to roof using three screws (NN). Raise second roof support (AA) to top of roof panel. (Shown in next step) Raise roof support (AA) into position against roof. Slide roof support (AA) into front header. Secure roof support to underside of truss leg with one screw (NN). 38 AA Repeat Steps 33 - 38 to secure remaining roof panels. 1 NN x3 2 Repeat step 37 and 38 for top support bracket.
Assembly - Doors 39 Stand right door (K) upright with three hinge mounts facing right. Slide one metal hinge plate (II) up onto each hinge mount. Rotate hinges to outside of door. K x3 II x3 2 40 41 K 1 x3 1 1 2 PP x3 2 OO x3 With metal hinge plates in open position, slide one hinge over each hinge receptacle on inside of right front panel. Secure each metal hinge plate with one screw (OO) and one locking nut (PP). Note: For clarity, illustration is shown with roof removed.
42 43 1 WW 1 VV 2 YY x4 1 1 1 2 O ZZ x4 2 2 WW 2 x4 VV 2 3 Lift upper D-ring (O) up to engage in front of header. Turn D-ring to right for locked position. From the outside of doors, insert door handle (V V, WW) stems into holes of left and right doors. On inside of doors, place washers (YY) on each door handle stem, and secure each with one screw (ZZ). 44 1 O 5/16" (12.7 cm) Max. 2 3/4" (7.6 cm) 1 1/2" Max. Push lower D-ring (O) down to engage with hole in floor.
The label located on the inside of the door contains information regarding your product. The QR code is a direct link to the product registration page on the Suncast website. The codes at the bottom of the label are specifically related to your product. Please have these numbers available should you need to contact Suncast. W1234567 | 22074153220 DO NOT REMOVE | NO REMOVER Patents, www.suncast.