BMS8100 Blow Molded Resin Storage Shed ASSEMBLY INSTRUCTIONS Tools Needed for Installation Easy Bolt Easy Driver 010210410 KEEP THESE INSTRUCTIONS, You will need Quality Control Number shown below to register your product, Quality Control Number: Assembled exterior dimensions 8' W.
A Before You Begin... + Consult your local authorities for any permits required to construct shed. Prior to the construction of your shed, check with the local building code official to review any required permits or building limitations. * A level and sturdy foundation is required before shed construction can begin. Review the site preparation information within the manual before beginning assembly. * Read instructions thoroughly prior to assembly.
A Shed Safety and Care # Hot items, such as recently used grills, blowtorches, etc., must not be stored in the shed. + Heavy articles should not be leaned against the walls, as this may cause panel distortion and permanent damage. * Keep roof clean of snow and leaves. * The shed walls and roof sections have a textured exterior, much like vinyl home siding. Over time, dust may accumulate in the texture. When combined with moisture, this could encourage the growth of moss or mold on the shed.
IMPORTANT OPEN ALL BOXES FIRST AND NEATLY LAYOUT PARTS. SMALL PARTS MAY BE CONTAINED IN EACH BOX. PLEASE REFERENCE THE PARTS LIST WITHIN THIS MANUAL TO VERIFY ALL PARTS ARE PRESENT. COMPLETE SITE PREPARATION AND FOUNDATION CONSTRUCTION BEFORE UNPACKING ALL PARTS.
Parts BMS8100 Doors IMPORTANT / OPEN ALL BOXES FIRST AND NEATLY LAYOUT PARTS. SMALL PARTS MAY BE CONTAINED r g IN EACH BOX. PLEASE REFERENCE THE PARTS LIST WITHIN THIS MANUAL TO VERIFY N ALL PARTS ARE PRESENT. R B R > COMPLETE SITE PREPARATION AND FOUNDATION CONSTRUCTION BEFORE e e UNPACKING ALL PARTS.
Parts BMS8100 Headers IMPORTANT OPEN ALL BOXES FIRST AND NEATLY LAYOUT PARTS. SMALL PARTS MAY BE CONTAINED IN EACH BOX. PLEASE REFERENCE THE PARTS LIST WITHIN THIS MANUAL TO VERIFY ALL PARTS ARE PRESENT.
Parts BMS8100 Truss IMPORTANT OPEN ALL BOXES FIRST AND NEATLY LAYOUT PARTS. SMALL PARTS MAY BE CONTAINED IN EACH BOX. PLEASE REFERENCE THE PARTS LIST WITHIN THIS MANUAL TO VERIFY ALL PARTS ARE PRESENT.
Parts BMS8100 Roof IMPORTANT OPEN ALL BOXES FIRST AND NEATLY LAYOUT PARTS. SMALL PARTS MAY BE CONTAINED N EACH BOX. PLEASE REFERENCE THE PARTS LIST WITHIN THIS MANUAL TO VERIFY ALL PARTS ARE PRESENT.
Hardware BMS8100 OMP00O0002 0480290 ~ 0480339 — Hardware bag Hardware bag SNy 625" Truss head screw Q x150 25" % 75" Phillips machine screw 0480336 — x4 Hardware bag )| 25" Locking nut 25" x 2" Hex Holt 625" Truss head screw Door hinge %195 6 2 X6 0480334 ~ 0480337 — Hardware bag | 0480338 — 0480340 ~ Hardware bag Hardware bag Hardware bag 25" % 75" Phillips machine screw X6 25" Locking nut Rubber washer | ose pekingese 25" 2" Hex bolt *Easy bolt easy driver Hardware shown at actual size (*Unless otherwise
Door Handle Kit BMS8100 0440647B Door Handle Kit @ ® 0630891A ~ Left 0630895 ~ Spacer handle plate x2 o 0630624 Door handle X2 0870147 Right handle plate Hardware 04803068 ~ Hardware bag ( W 25" Washer .25"x 1" Pan bl head screw x7 Hardware shown at actual size otherwise noted.) Extra hardware provided. Not all are used.
Site Preparation and Platform Construction Materials NOT supplied with BMS8100 Shed Kit Note: Site preparation is required for this shed. Placing the shed on a constructed foundation Is required, Without a constructed foundation, settling will probably occur, causing distortion and damage to the shed. Sun cast Is not responsible for replacing parts damaged or property lost due 1o incorrect assembly. Warranty requires foundation.
Site Preparation and Platform Construction (continued Materials NOT supplied with BMS8100 Shed Kit Wood platform critical spacing 1 asd 1444 (APPROXIMATE} s a 17 174 i P o 1zt [FRONT i o6v * Check all critical spacing measurements.
Door Pr-Assembly Peel film from both sides of window {R). Remove Place gasket (U), window (R}, and frame (T} into door protective film from door edge. channel. Secure with ten screws (JJ), starting at corners. Note: One side of fim will say *THIS SIDE OUT." Make DO NOT over tighten screws. Repeat for right door (M), sure this side faces out when installing window. Note: The cut portion of gasket (R} MUST be assembled on bottom of door channel.
Header Pr-Assembly Lay front header (J) on ground with lettering side facing Place header beam {Z) into pocket of front up. Place fiberglass vent screen (Y) into rear opening in header {J}. Secure with six screws (JJ). DO NOT over front header (J). Secure with eight screws (JJ). PO NOT tighten screws. over tighten screws. Slide roof ridge beam bracket {X) under tabs on inside peak of front header () and secure with two screws (JJ). DO NOT over tighten screws.
Ridge Beam Pr-Assembly Place ridge beam joiner (DDD) into the 3’ ridge beam {IEEE. Secure with hex bolt (MM} and nut {LL). A Part (EEE) orientation is critical, see picture. Place 7' ridge beam {V) onto the ridge bear joiner {DDED. Secure with hex bolt (MM) and nut {LL).
Roof and Truss Pr-Assembly Attach truss bracket {CC} to end of one truss leg (AA) Attach two truss cross beams (EE) to two truss legs with one hex bolt (RR) and one nut (LL). {AA} with two cap screws (MM} and two nuts {LL). Stand Repeat for second truss leg (AA). truss and check cross beam Is level. Attach side adapter bracket {FF) at end of left truss Place skylight gasket (YY)} into skylight (HH). Place leg (AA} with one cap screw {(MM) and one nut (LL}. skylight (HH} onto right roof panel (O}.
Shed Assembly/Walls Critical: When installing corners, flex corner hinges back and forth several times. This will help provide a square corner and ensure proper fit of remaining panels. Important: DO NOT flex in reverse position, as this can crack the panel. Push left floor (A) and right floor B) panels together and Repeat Step 15 for left floor extension (C) and right floor secure with six screws {JJ). extension (D). Secure with 15 screws.
Shed Assembly/Walls (continued) 7\ i Align tab on bottom of left front corner (E) with slot on Tip left front corner outward slightly and bend corner left floor (A). Lower panel into slot and lock in place by hinge. sliding panel toward door opening. Note: Use a rubber mallet to “push” left front corner (E} into locked position. Before proceeding, make sure corner is square {top view) where it meets the floor and that panel is flush {(side view) with floor. If not, repeat Steps 17-19 until square and flush.
Shed Assembly/Walls (continued) 19 Align tabs on bottom of side panel {F} with slots along floor (A}, Lower panel into slots and lock in place by sliding panel toward front corner. Note: Use a rubber mallet to “push” side panel (F} into locked position. Secure side panel (F) with four easy bolts (NN}, working from floor to roof. DO NOT use tongue wrench. Use easy bolt easy driver {O0) and hand tighten. Easy bolt head will be flush when fully seated. DO NOT over tighten easy bolts.
Shed Assembly/Headers and Truss Place front header {J) over door opening and fit four Place rear header (K} over back walls and fit four protruding support legs info pockets molded in front protruding support legs into pockets molded in back corners, Secure front header using two screws (JJ). walls. Secure rear header using seven screws (JJ). Slide truss assemblies into place. Secure with four False ridge beam (VEER) up and into rear header (K).
Shed Assembly/Headers and Truss (continued) Attach the roof truss assembly to the ridge beam with Attach truss strap (GG} to side adapter bracket {FF) with two screws (JJ). two screws () Repeat for remaining truss straps. Shed Assembly/Roof Before proceeding, locate and identify the six slots on interior side of right and left roof panels.
Shed Assembly/Roof (continued) 000Gy Before proceeding, locate and identify six front header Lay right roof (O} directly over three tabs on right side tabs and six rear header tabs. of front header (J). With right roof slots seated over/on header tabs, check alignment in all three spots. Press edge of right roof (O) into channel on truss leg (AA). Slide right roof {O} down towards the outside of shed.
Shed Assembly/Roof (continued) Repeat Steps 30-32 for remaining roof panels. install panels in the order shown. Note: At this point, fully tighten ALL hardware. Pull down each lower corner of roof from outside. From Secure roof 10 truss using six screws (JJ). Each screw inside shed, attach tabs on right front corner (I and side will attach at a corresponding screw boss on the roof. panel (F) to roof panel with four screws {JJ).
Shed Assembly/Roof (continued) s ] Raise roof support bracket {DD) into position against roof. Secure roof support to roof using three screws (JJ). Slide roof support bracket (DD} into front header.
Shed Assembly/Roof (continued) Push down the roof from outside. From inside shed, secure roof panels together along ridge of roof using nine rubber washers {QQ} and nine sealing screws (PP} Note: For clarity, frustration is shown with front header and right front corner removed. Stand right door {M} upright with three hinge mounts With door hinge in open position, slide one door hinge facing right. Slide one metal door hinge {{l} up onto each over each hinge receptacle on inside of right front panel.
Shed Assembly/Doors (continued) Secure each metal hinge plate with one screw (KK} and Insert screw stems, on left and right handle plates (TT) one nut {LL}. and (W), through the per-drilled holes in doors. While Repeat Steps 41-43 for left door (L). holding plates in place on exterior of door, secure each with two washers (WW) and two machine screws (XX}, Note: For clarity, Illustration is shown with roof removed.
SUNCAST® Building, Shed and Gazebo Ten Year Limited Warranty Your SUNCAST® Bulling, Shed or Gazebo has a TEN YEAR LIMITED WARRANTY against product allure resulting from defects in manufacturing or materials. The warranty period starts on the delivery date.