assembly Instructions

Mounting
8
information and values for guidance only.
The quality of the materials depends on the
local situation.
Consult a local professional if you have any
questions or doubt.
- Pencil / marking tool
- Ruler, yardstick / measuring tape
- Drill
- Masonry drills
- Spirit level
- Wrenches
- Latter
Before the Installation:
At least 3 strong adults must be
present to move and install the
awning It is bulky and heavy. Don’t try to
install the awning on your own. If the
awning falls down, this may lead to
serious injury and damage. Ask an
authorized professional for help.
Check if all bolts have been tightened
correctly before using the awning.
Carefully remove the awning from the
cardboard and remove the styrofoam
protectors from the awning. Remove the
plastic bags and plastic guards from the
awning and carefully place the awning
aside to avoid having it damaged by
scratches or otherwise damaged or
soiled during the installation.
The awning may only be installed on
solid walls or brickwork.
Mounting
Mounting example with awning installed
on a solid wall
Determining the Location of the
Awning
Choose a suitable location for the
installation.
If you intend to install the awning above a
balcony or patio door, you should leave a
space of at least 20 cm above the door
frame.
The approximate total drop area of the
awning depends on the type of the
awning:
- Drop: 60cm
Make sure that you consider this drop
when deciding where to install the
awning.
The tilt angle may be changed after the
installation.
NOTE: Fig. A shows the drop of the fully
extended awning.
(Total drop, front bar height 2,5m,
cross section of wall, top of wall bracket
height)
Use a yardstick / measuring tape to
measure the width of the awning and
mark the positions of the hooks the way it
is shown in fig. B.
Draw a horizontal line at the height of the
required location and use a long slat, a