Installation Guide

7 / 9
Hardware Pack 2
AA
M6X20 Screw
32PCS
BB
M6 Flat Washer
90PCS
CC
M6*20 Screw
26PCS
DD
M6X25 Screw
32PCS
JJ
ยข8*180 Stake
16PCS
Fig.11: Secure Post A and Long&Short Beam E by using Screw AA and Flat Washer BB as shown in
Fig.11.(Warning: the assembled top frame is heavy, for your safety, this step requires four or more people to
lift the assembled top frame when secure the post and beam)
Fig.12: Secure Support Bar D1&D2 and Post A by using Screw DD and Flat Washer BB, Secure Support
Bar D1&D2 and Beam E by using Screw AA and Flat Washer BB as shown in Fig.12.
Fig.13: Attach Base C to the bottom of Post A by using Screw CC and Flat Washer BB, fix the gazebo on the
ground with Stake JJ, cover the Base Cover B as shown in Fig.13.