Installation Guide
8 / 9
CountryofOrigin:China
Fig.10:Put small canopy four corner(S1) to small top frame end of adjustable tube(L)(as Fig.10-1)
adjust tube length till the canopy tight.
Fig.11:fix large canopy six corner(S) to large top frame adjustable tube(L)(as Fig.11-1)then adjust tube
length till large canopy tight.
Fig.12:Put ring(GG) through loop of mosquito netting(S2)hang mosquito netting on upper beam
(C1)(inner post)。
Fig.13:Put stake(FF)through bottom of post
stake plate(A6、A7、A8、A9, fix gazebo on ground。