Installation Guide
Hardware Packet 2
PART #
DESCRIPTION
QTY
LINE DRAWING
AA
M6 x 15mm bolt
16
BB
M6 Flat Washer
20
JJ
Hook (Mosquito Netting)
56
XX
M6 x 15mm bolt
4
Fig.10: Insert Bar 2 (C) into Connector 1 (A1).
Fig.11: Attach the other end of Bar 2 (C) to the assembled long and short beams with Bolt (AA) and Flat Washer (BB).
Fig.12: Place Hook (JJ) along the slot of the short and long beams, 8 hooks each long beam and 6 hooks each short beam.
Then attach Catch (O) to Long Beam (E1, E2) with Bolt (XX) and Washer (BB) .
Fig.7: Attach Connector 2 (A2) to Connector 1 (A1) with Bolt(AA)and Flat Washer (BB), and then screw Hook (L)
into Connector 2 (A2).
Fig.8: Insert Bar 1 (B) into Connector (1) (A1).
Fig.9: Insert the other end of Bar 1 (B) into Connector 4 (D).
XX