User manual
Rutland 914i Windcharger Installation & Operation
Doc No:SM-137 Iss. C 13.02.13 17 Marlec Eng Co Ltd
Specification and Performance
Guideline Performance Curve
Note : The curve shown below is for clear, non-turbulent wind conditions; this
may not be achieved in some installations. Refer to the section on Siting to
optimise performance at your site. Wind speeds are those flowing across the
turbine of the Windcharger and may not reflect those measured at mast top or
those reported by the Met. Office.
10
9
8
7
6
5
4
3
2
1
Charge into 24 V Battery (Amperes)