Manual

10 SunTouch WarmWire Installation Manual
Other Installations
Because many different room 
shapes and floor obstructions 
may be encountered in any given 
installation, additional layouts 
are provided below to assist in 
determining the best way to 
complete installations in odd-
shaped areas.
Corner shower or vanity
STEP 5.15  For an angled area,
such as a corner shower,first cut 
several pieces of strap a  little longer 
than the cable spacing being used.
STEP 5.16  Use a chalk line or pen 
to mark the floor at 3”from the 
edge of the shower.
STEP 5.17  Use this chalk line to 
attach each piece of  strap to the 
floor so that the cable does not get 
any closer to the corner shower 
than 3”.Make sure that the cables 
are spaced evenly and parallel to 
one another.
STEP 5.18  Fill in the section with 
cable.
Door entryway
STEP 5.19  For an entryway or 
other small area where warmth is 
required,begin by cutting two lengths of strap a little shorter than the 
length of the entry opening. Then secure the two straps parallel to each 
other.
STEP 5.20   Fill in with cable,adjusting spacing as necessary to fill in as 
much of the area as possible.
Bench Seat
STEP 5.21  If covering a bench seat or step area (not in a shower area),
place a single run up the riser.Use straps to secure the cable to the seat 
area at the desired spacing, then install a  single run down the riser.Again,
the cable on the riser and seat area MUST be fully embedded in mortar 
and have approved floor coverings. Use hot glue where necessary to 
secure the cable flat against the riser.
Shower area installation
Model Numbers ending “-J” on the UL tag only:
This application into a shower area must be verified by the local inspector
or the authority having jurisdiction. (UL Listed to U.S. Standards only at
this time for this application.)
STEP 5.22 “UL tag -J” series cable may be installed into a floor or bench
seat located in a shower area. It must never be installed into walls. In
general, the cable should be completely embedded into mortar directly
below the surface coverings of tile or stone. Other types of coverings
are not recommended. It may be installed into a mortar layer lower than
this and beneath the waterproof system, however performance will be
reduced.
STEP 5.23 Make sure the power lead factory splice (the connection
between the power leads and the heating cable) is located outside the
shower area and at least 1’ away from shower openings and other similar
areas normally exposed to water. Make sure the control is located at least
4’ away from shower openings such that it cannot be exposed to water or
touched by a person in the shower area.
STEP 5.24 If the heating cable must enter the shower area over a curb,
notch the corners of the curb or provide other means to ensure the cable
is not bent sharply or pinched when surface coverings are installed. Do
not damage any waterproofing components, and do not run the heating
cable through the curb.
STEP 5.25 If covering a shower floor, cut lengths of strap and secure to
STEP 5.18
STEP 5.16
STEP 5.15
STEP 5.19
STEP 5.17
STEP 5.20