Manual

SunTouch WarmWire  Installation Manual  9
may result and may cause dangerous problems.Extra forethought at this 
stage will make the rest of the installation  much easier.
General Installation
STEP 5.5  Measure about 3” from the wall for the strap.If the design called 
for 6”–12”away from the wall,install the strap at that distance.In counter 
or vanity kick-spaces,install the strap so the cable will be 1-1/2” to 2” away 
from the vanity.
STEP 5.6  Cut the strap to fit  the length of the first area.
STEP 5.7   Secure the strap to the floor using double-sided tape (if factory 
supplied with your cables), or using a 
strong spray adhesive (such as 3M™ 
Hi-Strength 90 or similar), spray an 
even coat onto the backside of the 
strap and the area of floor where it 
will be placed,allow the  adhesive to 
get tacky (per product instructions),
then turn the strap over and firmly 
press onto the floor. Follow all manu-
facturer‘s instructions when using a 
spray adhesive.
STEP 5.8  For floor surfaces other 
than concrete,secure the strap to the 
floor using galvanized nails or screws.
Secure the strap every 6”–10”.
STEP 5.9  For added securement, on 
concrete floors,use a hammer drill to 
set holes into the concrete.Secure the 
strap every 6”–10” by driving anchors 
into the holes.
STEP 5.10  Cut another piece of 
strap for the other end of the area 
and secure 3” from the wall(s) or other 
obstruction(s).
STEP 5.11  Unreel the  p ower leads 
of the cable up to the factory splice.
Let the coil of power leads sit on 
the floor for now. Beyond the fac-
tory splice is the heating cable itself.
Factory splice must be installed 
in the mortar bed.CAUTION:
Completely embed the factory
splices and heating cable in the
mortar, and never bend the factory
splices. NEVER allow any part of the
splice or heating cable to enter a
wall or drop through the subfloor.
STEP 5.12  Before installing more 
strap,fill in the first section with 
cable.Begin by making a “strain-
reliefat the beginning so the cable 
is not accidentally pulled loose.
Zigzag the cable under the tabs only 
as shown. Press the tabs down to 
secure the cable.
STEP 5.13  Weave the cable back 
and forth across the area at the 
desired spacing until the  other side 
of the room has been reached.Once 
this area is completed,press down all 
the tabs.NEVER space the cables less 
than 2”apart.
STEP 5.14 If there are additional 
areas to cover with cable,cut the 
lengths of strap necessary,attach 
them to the floor, and begin weaving 
the cable into that area.
STEP 5.8
STEP 5.9
STEP 5.5
STEP 5.7
STEP 5.6
STEP 5.10
STEP 5.12
STEP 5.13
STEP 5.11