User's Manual
Chapter 2: Server Installation
2-1
       Chapter 2       
     Server Installation       
2-1 Overview
This chapter provides a quick setup checklist to get your SuperServer 5015M-
UR/5015M-U/5015M-NTR/5015M-NT up and running. Following these steps in the 
order given should enable you to have the system operational within a minimum 
amount of time. This quick setup assumes that your system has come to you with 
the processors and memory preinstalled. If your system is not already fully integrat-
ed with a serverboard, processors, system memory etc., please turn to the chapter 
or section noted in each step for details on installing specifi c components. 
2-2  Unpacking the System
You should inspect the box the SuperServer 5015M-UR/5015M-U/5015M-NTR/
5015M-NT was shipped in and note if it was damaged in any way. If the server itself 
shows damage you should fi le a damage claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the 5015M-UR/5015M-
U/5015M-NTR/5015M-NT. It should be situated in a clean, dust-free area that is 
well ventilated. Avoid areas where heat, electrical noise and electromagnetic fi elds 
are generated. You will also need it placed near a grounded power outlet. Be sure 
to read the Rack and Server Precautions in the next section.     
2-3  Preparing for Setup 
The box the SuperServer 5015M-UR/5015M-U/5015M-NTR/5015M-NT was shipped 
in should include two sets of rail assemblies, two rail mounting brackets and the 
mounting screws you will need to install the system into the rack. Follow the steps 
in the order given to complete the installation process in a minimum amount of time.  
Please read this section in its entirety before you begin the installation procedure 
outlined in the sections that follow. 










