Instructions / Assembly

STORING PANELS
If your Superior panels have been stored in a hot environment,
let them cool for 24 hours prior to installation. If they were in a cool
environment, they can be installed as is.
INSTALLING PANELS
Install Superior faux panels as tightly as possible and follow the storage
and installation instructions carefully.
Because of the highly textured surface of Superior faux panels, it is
backside of the panel.
Superior faux panels interlock at each end and overlap top and bottom
you have a staight edge to start with—the horizontal protruding lip
of the panel should be on the top.
Make sure the back of the panel and the walls are free from dust,
dirt, or other contaminants.
Apply a generous amount of construction adhesive such as
PL Premium®, or Liquid Nails® in a vertical pattern. Adhere the panel
to the wall, making sure it is level, and hold in place while the adhesive
screws) for exterior applications over concrete or masonry, make sure
Place your fasteners where a small hole will not be noticeable. If you
need to further conceal a hole you can apply a dab of a matching
caulk (available at your local hardware store).
each panel is level and secure.
so the vertical seams between panels are not in alignment from
row to row.
The inside and outside corners are designed to continue the panels
into and around corners, simply measure and cut the panel to butt
up tightly against the corners.
The ledge can be placed on top of a panel tonish the look,
if desired.
Hammer
Saw
Level
Tape Measure
Construction
Adhesive
Screws or Nails
WHAT YOU WILL NEED:
Superior faux panels are
lightweight and easy to install.
Superior faux panels cuts
like wood and only requires
simple carpenter tools:
Store Superior faux panels on a at surface to prevent bowing.
www.SuperiorBuildingSupplies.com 888-328-9232
Superior
Building Supplies
Installation Instructions
is curing, screw or nail the panels into place. Use tap cons (concrete

Summary of content (1 pages)