2-1 Overview
This chapter provides a quick setup checklist to get your SuperServer 5015M-
UR/5015M-U/5015M-NTR/5015M-NT up and running. Following these steps in the
order given should enable you to have the system operational within a minimum
amount of time. This quick setup assumes that your system has come to you with
the processors and memory preinstalled. If your system is not already fully integrat-
ed with a serverboard, processors, system memory etc., please turn to the chapter
or section noted in each step for details on installing specifi c components.
2-2 Unpacking the System
You should inspect the box the SuperServer 5015M-UR/5015M-U/5015M-NTR/
5015M-NT was shipped in and note if it was damaged in any way. If the server itself
shows damage you should fi le a damage claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the 5015M-UR/5015M-
U/5015M-NTR/5015M-NT. It should be situated in a clean, dust-free area that is
well ventilated. Avoid areas where heat, electrical noise and electromagnetic fi elds
are generated. You will also need it placed near a grounded power outlet. Be sure
to read the Rack and Server Precautions in the next section.
2-3 Preparing for Setup
The box the SuperServer 5015M-UR/5015M-U/5015M-NTR/5015M-NT was shipped
in should include two sets of rail assemblies, two rail mounting brackets and the
mounting screws you will need to install the system into the rack. Follow the steps
in the order given to complete the installation process in a minimum amount of time.
Please read this section in its entirety before you begin the installation procedure
outlined in the sections that follow.