Instruction Manual
NATURAL GAS SAFETY PILOT KIT
MODEL: CVS-303
Supplemental Installation Instructions for use on
Emberglow Natural Gas Vented Log Sets
NOTE: This kit is for Natural Gas and L.P. Gas applications. For L.P. or Propane Gas installation see separate
instructions packaged with necessary hardware. (Do not use the Natural Gas orice supplied with this kit on
L.P. or Propane Gas Installations as improper combustion will occur.
IMPORTANT
Read and follow all instructions carefully as these supplemental Pilot Assembly instructions are to be used in
conjunction with the General Installation Instructions supplied with all Emberglow Natural Gas log sets.
PARTS LIST & ILLUSTRATION
NOTE: Be sure to turn Pilot adjust screw counter-clockwise (Q) two (2) turns to get gas flow to the pilot.
Part
No. Description
Part
No. Description
Part
No. Description
1 Control Knob 9 Sheet Metal Screw (1) 18 3” Pipe Nipple
2 Extension Handle 10 Bolt (2) 19 3/8” Female Elbow
3 Gas Control Valve 11 Nut (2)
20a
3/8” Natural Gas Orice -
18” Small Center Hole
4 3/8” Straight Flare Fitting (2) 12 Pilot Orice - Natural Gas
5 Thermocouple Lead 14 Pilot Supply Line Nut*
20b
3/8” Natural Gas Orice -
24” & 30” Large Center Hole
6 Pilot Gas Supply Line 15 Heat Shield
7 Pilot Burner 16 Lock Nut 21 3/8” Flare & Swivel Connector
8 Pilot Bracket 17 90 Degree Street Elbow (2)
National Code requirements mandate the use of a Pilot Safety Valve on all L.P. or Propane gas
applications. These regulations must be followed on all installations of this type.
1
2
3
4
21
20b
20a
19
18
17
16
10
11
8
9
12 & 14
5
6
4
*Packaged separately in LP Conversion bag
15
7