Veritek Bathtub and Shower Wall Kits TI-3 Bathtub Wall Kit TI-33 Extension Kit TI-5 Bathtub Wall Kit TI-55 Extension Kit TF-57 Bathtub Wall Kit GN-58 Tub Wall Kit Product Warnings Safety Guidelines Required Tools Kit Contents Preparation Tips Installation Procedure Cleaning & Maintenance Warranty Information TF-57 TI-NEO-DTF Corner Shower Wall Kit TI-7236 Shower Wall Kit TI-7248 Shower Wall Kit TI-7260 Shower Wall Kit GN-58 TI-NEO-DTF TI-3 TI-7236 TI-7248 TI-7260 R TI-5 TI-33 ea
The Swan Corporation Assurance — if our product is properly installed and maintained, as stated in these instructions, it will not leak. Remember – Safety First IMPORTANT NOTICE The Swan Corporation, the makers of the Swan Corporation Wall Systems and Panels, cannot anticipate every possible circumstance that might involve a potential hazard during the installation of our product(s). The warnings and instructions in this installation guide are, therefore, not all-inclusive.
Safety Guidelines IMPORTANT NOTICE CAUTION IMPORTANT NOTICE: Indicates that equipment or property damage can result if instructions are not followed. CAUTION: Indicates a potentially hazardous situation which, if not avoided, may result in injury. It may also be used to alert against unsafe practices. Read and Understand the Manual It is the responsibility of any individual who installs or maintains this product to fully understand and follow proper installation and maintenance procedures.
Safety Guidelines Cutting Hazard The installation of the Swan Corporation product may require using power tools. Keep hands away from the cutting edge of any tool used in the installation of our product. Placing fingers in or around the cutting blades could result in serious personal injury. WARNING WARNING: Indicates a potentially hazardous situation which, if not avoided, could result in serious injury or death. Sharp Edge Hazard After cutting the edge of a Swan Corporation panel, it can be sharp.
Safety Guidelines General Information General Information WARNING Required Tools WARNING: Continued Saber saw (straight up and down travel) with bi-metal blade (14 teeth per inch ) Power Tool Hazard To prevent personal injury or possible death, always follow the electrical safety recommendations of the power tool’s manufacturer. Do not use power tools in an unsafe manner. Power tools should only be connected to a circuit protected by a ground-fault circuit interrupter (GFI).
General Information TI-55 Extension Kit (Tile Design) One back panel Two corner panels Two side panels One tube of silicone adhesive One tube of color coordinated caulk TI-7248 Shower Wall Kit (Tile Design) One back panel Two corner panels Two side panels Four tubes of silicone adhesive One tube of color coordinated caulk Designed for use with TI-5 Fiberglass Wall Kit. Fits bathtub enclosures 53 to 60 inches wide and 29 to 30 inches deep. Wall panels are 24 inches high.
General Information Unpack Carton Preparation Tips Use care when opening the box so that you do not damage the panels. Measure the width of the back wall (with green board) installed. This measurement cannot exceed the width of the Swan Corporation back panel(s). If the wall opening is too small or too large, other methods will be required to cover the wall. This product is shipped to you or your retail center after careful inspection.
General Information Swan Corporation panels can be installed over a variety of products. If you intend to apply the panels to any surface other than those described, consult with a professional contractor. Use the following sections when installing this product over: Old Tile Depending on the condition of the existing wall surface, additional silicone may be required to ensure contact between the substrate and the wall panel.
Installation Procedure Followed carefully, these installation instructions will result in an easy, trouble-free installation of your Swan Corporation product. Any deviations, additions, and/or deletions from the prescribed installation, without prior written approval, will void the warranty covering this product. Not following the directions could also result in personal injuries, water damage, and other damage to floors, pipes, walls, and other portions of your building or home.
Installation Procedure Veritek Wall Kits Installation IMPORTANT NOTICE To prevent possible water (wicking affect) damage to the wall, install the wall board with a 1/2 inch gap above the bathtub or shower floor side lip, the front edge of the bathtub or shower floor, and the room floor. IMPORTANT NOTICE Before beginning, refer to the General Information section for important information on how to prepare the existing bathtub or shower walls for installation.
Installation Procedure Wall Kits With Separate Corner Panels - TF-57, TI-5, TI-NEO-DTF, TI-7236, TI-7248, and TI-7260 IMPORTANT NOTICE Model TI-7236, TI-7248, and TI-7260 Shower Wall Kits. The sides of the corner panels are different widths. One side is 5 inches wide and the other is 7 inches wide. The orientation of the corner panel will affect the allowable width of the wall dimensions. Refer to the illustration and chart for proper orientation.
Installation Procedure 4. Carefully position the corner panel and firmly press the surface of the corner panel against the walls. Apply hand pressure up and down and side-to-side, making sure all areas are in firm contact with the wall. It is important to apply hand pressure to the entire surface of the panel to bond it to the wall surface. WARNING Fumes Hazard The fumes from the silicone adhesive and solvents used by the installer can be harmful if used in an unventilated room.
Installation Procedure Side Panels WARNING Most side panels are designed to fit a certain way. Check for identification tags on the back of panels and/or bullnose edges, which align with the front edge of the bathtub, shower floor, or apron strips, if installed. Dust Hazard When cutting or drilling the Swan Corporation product, use a dust collection method which prevents dust particles from going into the air. Always work in a wellventilated area.
Installation Procedure 5. Trial fit the panel, and make any necessary adjustments. 7. Apply the silicone adhesive in 1-1/4 inch diameter dots every 8 to 10 inches over the back surface of the panel. Follow the silicone manufacturer’s instructions and note all ventilation and installation precautions. WARNING Fumes Hazard The fumes from the silicone adhesive and solvents used by the installer can be harmful if used in an unventilated room. Always work in a well-ventilated area.
Installation Procedure 2. Clean the back of the apron strip with denatured alcohol. Apron Strips Apron strips are included in some wall kits to give a finished appearance to side panels that project beyond the front edge of the bathtub or shower floor. Trial fit apron strips with side panels before final installation. IMPORTANT NOTICE TI-5 Bathtub Wall Kit. If installing a shower door, do not install the apron strips.
Installation Procedure 2. Clean the back of the panel with denatured alcohol. Back Panel Note: Corner wall units do not have back panels. If installing a corner shower wall unit, skip to the Temporary Bracing section. 1. Trial fit the back panel, and make any necessary adjustments. IMPORTANT NOTICE Do not use oil-based cleaners, such as mineral spirits, to clean the panels. The oil in the cleaner will prevent the panel from properly adhering to the wall. 3.
Installation Procedure Veritek Wall Kits With Corner Side Panels - GN-58 and TI-3 4. Install the back panel, overlapping the corner panels. Carefully line up any faux grout lines. Press the back panel firmly to the wall. Use even hand pressure from top to bottom and side-to-side, to ensure solid wall contact. TI-3 GN-58 Note: Faux tile wall kit installation shown. Smooth finish wall kit installation is the same.
Installation Procedure 3. Use the measurements to make a cardboard template in order to check for proper fit around the plumbing outlets. Trial fit the cardboard template, and adjust as necessary. 4. Transfer the template measurements to the corner side panel. WARNING Dust Hazard When cutting or drilling the Swan Corporation product, use a dust collection method which prevents dust particles from going into the air. Always work in a wellventilated area.
Installation Procedure 6. Trial fit the panel, and make any necessary adjustments. 7. Clean the back of the panel with denatured alcohol. Note: The corner side panel should not extend all the way to the front edge of the bathtub. IMPORTANT NOTICE Do not use oil-based cleaners, such as mineral spirits, to clean the panels. The oil in the cleaner will prevent the panel from properly adhering to the wall. 8.
Installation Procedure 9. Carefully position the corner side panel tight against the corner and firmly press the surface of the panel against the walls. The corner side panel should not extend all the way to the front edge of the bathtub. Back Panel 1. Trial fit the back panel, and make any necessary adjustments. 10. Apply hand pressure up and down and side-to-side, making sure all areas are in firm contact with the wall.
Installation Procedure 4. Install the back panel, overlapping the corner side panels. Carefully line up any faux grout lines. Press the back panel firmly to the wall. Use even hand pressure from top to bottom and side-to-side to ensure solid wall contact. IMPORTANT NOTICE Do not use oil-based cleaners, such as mineral spirits, to clean the panels. The oil in the cleaner will prevent the panel from properly adhering to the wall. 3.
Installation Procedure Veritek Extension Kits (Tile Design) - TI-33 and TI-55 3a. Veritek Extension Wall Kits With Separate Corner Panels: Follow the step-by-step instructions in the Veritek Wall Kits With Separate Corner Panels section to cut needed plumbing outlet openings, trial fit panels, apply silicone adhesive, and install the panels of the extension kit. 3b.
Installation Procedure Temporary Bracing 2. Place two braces against each left and right wall. Install the temporary bracing to hold the wall panels in place until the silicone adhesive is completely set (usually 24 hours). This will allow proper curing of the silicone. IMPORTANT NOTICE To ensure contact between the panels and walls until the silicone adhesive sets, install the temporary bracing after completing installation.
Installation Procedure Maintenance & Cleaning Caulking 4. Insert (wedge) blocks or cross braces between the front to rear panel braces and the back panel braces. These blocks or braces must apply pressure to the back panel to hold it in place. Note: Install any optional extension wall panel kit and/or optional window trim kit before caulking edges and seams. 1. Apply a bead of color coordinated caulk to the edge where the bottom of the tub wall panels meet the tub ledge. 2.
Warranty Care and Cleaning LIMITED WARRANTY FOR RESIDENTIAL APPLICATIONS Swan Corporation Veritek products are stain and abrasion resistant; however, the finish requires reasonable care. If a Swan Corporation product covered by this warranty is found to be defective in materials or workmanship after inspection by an authorized Swan Corporation representative, we will repair, or at our option, exchange the product for a similar model.
LIMITED WARRANTY FOR COMMERCIAL APPLICATIONS If a Swan Corporation product covered by this warranty is found to be defective in materials or workmanship after inspection by an authorized Swan Corporation representative, we will repair, or at our option, exchange the product for a similar model. This warranty extends for a designated period of time, so long as it remains in use in its original place of installation.
Save these Installation Instructions for future reference. They provide important information on cleaning and maintenance of Swan Corporation products. www.theswancorp.