Installation & Assembly

38
STEP 28
1. Slide Awning Support through pocket on Awning bottom as shown.
2. Attach the top of the Awning to the top board using (5) 3/4’ screws and washers as shown.
3. Attach Awning Support to 3’ x 3’’ uprights with (1) 2’’ Lag Screw per side.
4. Push lightly down on the Awning Support to make the Awning taught, as shown. While one person
maintains the pressure on the Awning, have a helper secure the Awning Support in place with (1)
additional 2’’ Lag screw on each side of the Awning Bar, as shown.
SLIDE BAR THROUGH POCKET IN AWNING
1’’ FROM GROMMET CENTER
(5) 3/4’’ Pan
Head Screws
(5) 3/16’’ Tarp
Washers
(1) 2’’ Lag Screw
per side
2” Lag Screw (x4) 3/4” Pan Screw (x5)
(1) 2’’ Lag Screw
per side
(1) Awning
(1) Awning
Support