Full Product Manual
Bottom Support
Wall
Square
1. Rough-In
· Rough plumbing must be pre-installed by a licensed plumber before shower base installation.
· If floor drain-hole installation is needed, contact a licensed plumber.
· Dimensions given during roughing-in are crucial for a proper installation.
— 2 —
2. Level the Floor
· A) Verify that the shower base is level using the “level” tool on all four sides.
· If the shower base is level proceed to step B.
· If shower base is not level use shims or mortar compound to adjust accordingly. Verify with a level.
· B) Mark drain hole on floor. All in floor plumbing must be installed by a licensed plumber.
SHOWER BASE INSTALLATION INSTRUCTIONS
L
W
Studs must be
flush and square
Stud opening tolerance is
+1/4” and -1
L
W
10”
10”
Rough-In
10” x 10” Floor cut-out
Wall studs
To ensure base is installed
correctly, entire bottom support
must contact a flat, level surface
Bottom Support