Installation
TWO-PIECE TOILET INSTALLATION INSTRUCTIONS
Wall Pipe
(for wall outlet)
— 1 —
If you have any questions or concerns please contact us:
1-434-623-4766
info@swissmadison.com
PRIOR TO INSTALLATION:
· Inspect toilet to ensure no damages have occurred while in shipping.
· Observe all plumbing and building codes in accordance with your state and local requirements.
· All dimensions are nominal! Be sure to measure your toilet prior to installation.
· The step-by-step guidelines in the installation instructions are a general reference. Should there be
any discrepancies, Swiss Madison cannot be held liable. It is recommended to install all Swiss
Madison products by hiring a licensed professional.
· Read installation and maintenance instructions thoroughly before installing. Be sure to use proper
tools and always wear proper personal safety accessories for your protection.
· Two people are recommended to handle and install this product as it is fragile.
· Fill valve has been factory-tightened to design specifications. If re-tightening is required, use a
wrench a tighten one turn past finger tight.
· Make sure the supply pressure is a minimum of 35 psi (2.5kg/cm³), the toilet will not function
properly without minimum water pressure.
INCLUDED PARTS:
SUGGESTED TOOLS & MATERIALS:
Safety
Glasses
Wrench
Level Screwdriver
Putty Knife Tape
Measure
HacksawFlexible
Supply Tube
Bolts
Cover
Caps
Wax Ring/
Gasket
Two-Piece
Toilet