Installation
Studs must be
flush and square
L
W
L
W
10”
10”
Rough-In
1. Read the complete instruction manual before beginning installation.
2. Confirm that your model will fit in intended location and plumbing fixtures are
located where legally required before beginning installation.
3. Not all drawings on this manual are drawn to scale. Please refer to the model chart.
4. Walls and sub-floor must be solid, flush and square.
5. Always use drop cloth to protect shower base from damage during installation.
6. Two people are recommended to install and move this product.
Stud opening tolerance is
+1/4” and -1
1. Rough-In
· Rough plumbing must be pre-installed by a licensed plumber before shower base installation.
· If floor drain-hole installation is needed, contact a licensed plumber.
· Dimensions given during roughing-in are crucial for a proper installation.
10” x 10” Floor cut-out
Wall studs
6
NOTE: This manual shows our recommended installation method,
if your installation requires another method and you should consult a professional prior.
NOTE: All measurments are nominal.
SHOWER BASE INSTALLATION INSTRUCTIONS