Installation
4. Installing Shower Base
· Re-insert shower pan into shower cavity leaving 1/8” (use shims) between wood studs and shower
· Re-insert shower pan into shower cavity making sure that the shower base drain and floor
rough-in are aligned.
· Before laying down shower base, fill shower cavity with expanding foam in snake formation.
Leave 6-8 inches from end of shower area empty if expanding foam.
base on all sides.
· Verify shower base is level using level tool on all 4 sides.
· Place drop cloth in bathtub and stand inside the shower base to press it to the floor when securing
to the wall studs.
NOTE: Expanding foam generally settles within 10-15 minutes.
Level
Side Flange
Top Flange
Wall Studs
1/8” gap
Square
Square
Shim
8
SHOWER BASE INSTALLATION INSTRUCTIONS