SM WC426 Carrier Manual min

8
Toilet Installation
L2
L1
L1+15/16”
L2
L2+1/8”
L1
1. Fit Pipes
· Install pipes and make sure they are thoroughly inserted.
· With a ruler, mark a line on the pipe where it meets the finished wall.
2. Cut Pipes
· Measure the distance between both marked lines on pipe.
· Cut pipes as shown below.
· After cutting, take a file and remove all burrs. Try and bevel pipe edge.
· Remove from wall and install pipes in the back of the toilet and make sure they are thoroughly inserted.
· With a ruler, mark a line on the pipe where it meets the back of the bowl.
WALL-HUNG CARRIER SYSTEM INSTALLATION INSTRUCTIONS