Installation Guide

CLEAN
Clear the space and thoroughly sweep the subsurface.
STEP 1
Facing the garage door, lay the first tile and edge in the front, le
corner. The tile should be positioned with the loops facing the back
wall of the garage and the right side wall.
STEP 2&3
Build the first row of tile and ramp
edging along the front of garage
opening working le to right, then
front to back.
REMEMBER
Leave an expansion gap of ¼”
to ½” along all walls and other
stationary objects.
Be sure the rubber seal on the
bottom of the garage door
contacts garage floor not the
tile.
STEP 4
Continue filling in the remaining
area to be covered working in a
‘L’ shape from le to right then
front to back.
TRIM
Trim any tiles as needed and
attached all ramps.
3
STEP
2
STEP
4
STEP
CLEAN
1
STEP
MODULAR FLOORING TILE
Installation Instructions

Summary of content (1 pages)