Programming Instructions

If you want to change an action, go to the desired event, make the
desired change (Action, date, recurrence).
After the first modification, the "Modify" button will appear instead of
the "Add" button.
Once all changes have been made, click on “Modify”.
If you want to delete an action, go to the event you want to delete,
then click “Delete”.
Realized :
Action Cleaning
- Selection of the action you want to appear as performed, on
this selection button we find the information of the selected
action (Cleaning). Tap it to change it.
Planned date 28/02/2022
- Check the box if you want an action that was planned to
appear as performed. Otherwise uncheck the box and the
action will be added to the list of the history of the actions
carried out without impacting the one planned.
This date cannot be modified.
Realized date 22/02/2022
- Date of the day and to which will be indicated the action that you will appear as carried out.
This date cannot be modified.
Next date 15/03/2022
- If you have checked “Planned Date” and you have put a recurrence to the action in question then it
will be indicated the next date on which the planned action.
This date cannot be modified.
It is possible to select on the calendar an action that is planned. In this case all the information (Element,
action, scheduled date, etc.) will be filled in automatically.
Click on “Add” to validate.
Once you have added a new action, it will appear in the “History” window.
Add
SI1 Sensor Conductivity
Realized
History
Planned
Action Cleaning
Next date
Repeat every
26/03/2022
week(s)
Remove Modify
SI1 Sensor
Conductivity
Realized
History
Planned
Planned date
Action
Cleaning
Realized date
22/02/2022
Next date
15/03/2022
Add
28/02/2022