Installation Instructions

Mechanical and hydraulic installation Page 15/24
Installation and commissioning instructions
Water the flow chamber and adjust the flow meter to reach the required flow rate (30l/h) using
the flow adjustment screw.
Step 2
Position the probe ring
from the top of the probe.
Step 3
Insert the probe into the measuring chamber.
Position the
clamping nut
from the top of the probe
Step 4
Lock the tightening nut
until the O-ring seals.
Step 5
Position the probe ring
from the top of the probe.
Insert the probe into the measuring chamber.
Position the clamping nut
from the top of the probe
Lock the tightening nut
until the O-ring seals.