User's Manual

Table Of Contents
Symeo LPR
®
-System
LPR
®
-2DB
Product Documentation
Introduction
Copyright © Symeo 2012
Page 15 of 132
2.3 Project Planning
The planning from identifying the position for the transponders to the commissioning with
Symeo MAP is separate into intermediate steps. In the following all possible steps are listed
with refer to the relevant chapter in this document.
ToDo
Description
Responsible
Relevant
chapter
1
Definition of measurement
area/cell
Analyzing of layout,
pictures, definition of
mounting positions
Customer
provides
information to
Symeo
---
2
Definition of local
coordinate system, point
of origin
Local Coordinates
available? Coordinates of
light towers available?
Customer
---
3
Definition of operating
mode
3 operating modes are
available. Operating mode
depends on the number of
vehicles and the number of
cells
Symeo
Chapter 3.2
4
Definition of vehicle model
HoverTrack-model or
VehicleTrack-model
Symeo
Chapter 3.3
5
Definition of antenna
positions and position of
mobile unit on the vehicle
for mounting
Defining mounting position
of 1, 2, 3 or 4 antennas on
the vehicle
Customer/
Symeo
Chapter 5.3
6
Definition of the height of
the antenna above ground
level
The height of the top of the
antennas above ground
has to be calculated to set
the appropriate height for
the mounting of the
transponders, height of
transponders ideally
0.5meters over antennas
level, up to 2.5meters is
possible
Customer
Chapter 6.3
7
Definition of protocol for
interface
Structure of the protocol
can be configured.
Customer/
Symeo (if
information is
provided)
Chapter 0
8
Mounting of the LPR-2DB
Integral Station on the LTs
Mounting of the LPR-2DB
Integral Station (labeled
XX0, XX1, XX2, XX3, XX4,
XX5 and Master XXM)
according to the files Visio-
LPR_CellPlanning.pdf and
Customer
Chapter 5.2