User's Manual

Table Of Contents
Symeo LPR
®
-System
LPR
®
-2DB
Product Documentation
Installation
Copyright © Symeo 2012
Page 41 of 132
5.2.3 Allocation of LPR-2DB Integral Stations and Installation Points
If a cell plan and/or a light pole allocation table is drawn by Symeo or together with Symeo,
the position and orientation of the LPR-2DB Integral Station must be installed referred to this
master document. The cell plan contains the LPR-2DB Integral Stations with a definite
identifier installed at the wall or on the light poles (compare chapter 7.1.1).
(0,0,0)
x
y
Short-ID: 101
Short-ID: 10M
Short-ID: 102
Short-ID: 103
Short-ID: 104
Short-ID: 100
Short-ID: 105
Figure 21 Example Cell plan for one cell
LPR-2DB Integral Station
Installation
Cell
ID
Angle
Pole
10
0
-143
LT-11
10
1
-90
LT-08
10
2
-41
LT-05
10
3
0
LT-06
10
4
180
LT-09
10
5
-180
LT-12
10
M
-40
LT-05
Table 1 Example of light pole
allocation table
5.3 Installation of LPR antennas
5.3.1 Connection of antenna cables to the mobile units (LPR-2DB Station)