User's Manual
Table Of Contents
- 1 General
- 2 Introduction
- 3 System Description
- 4 Hardware
- 5 Installation
- 6 Coordinate System
- 7 Commissioning
- 7.1 Check list installation and surveying
- 7.2 Editing of configuration files for the DSP
- 7.3 Upload of configuration files for the DSP
- 7.3.1 Connection with LPR mobile unit (type: compact) via TCP/IP
- 7.3.2 Connection with LPR mobile unit (type: compact) via RS232
- 7.3.3 Upload DSP configuration file for LPR mobile unit (base station)
- 7.3.4 Upload DSP configuration file for master transponder unit
- 7.3.5 Upload DSP configuration file for transponder unit
- 7.4 Editing of configuration files for Fusion Engine
- 7.5 Upload configuration files for FusionEngine
- 8 Symeo MAP
- 9 Network Settings
- 10 Symeo 2D Protocol
- 11 Appendix A: Agency certifications
Symeo LPR
®
-System
LPR
®
-2DB
Product Documentation
Coordinate System
Copyright © Symeo 2012
Page 48 of 132
Figure 28 – Position of the measuring point on the Integral Station
6.1.3 Orientation of LPR-2DB Integral Station
The alignment of the stations is recorded as a vector in the coordinate system that is defined
for the application, and is entered as an ex/ey value. Integer values are possible for ex/ey.
The following diagram illustrates this principle (corresponding negative values for an opposite
alignment).
Figure 29 – Examples of LPR-2DB Integral Station alignment with ex/ey value