Installation Guide

Page 3
2) Attach escutcheon
3) Attach dome cover
4) Attach handle
5) Attach showerhead
6) Attach tub spout
1) Attach escutcheon
mounting plate
factory
installed
gasket
1/8"
7) Flush system, check for leaks
Turn valve to the warm position
and run for a few minutes.
If system is dirty, remove valve
spindle in center of valve to
ensure proper ushing. (See
service instructions.)
Check for leaks around valve
assembly and all pipe ttings.
8) Set Temp Limit stop screw
Reference page 2, gure 3
e temperature limit stop screw
limits valve handle from being
turned to maximum position
resulting in excessive hot water
discharge temperatures.
Warning: Failure to
adjust Temp Limit stop
screw properly may result
in serious scalding.
Place handle on control spindle
stem and open valve to maximum
desired temperature.
Turn Temp Limit stop screw
clockwise until it seats.
Note:
Do not install positive shut-
o devices on control valve outlet or
devices that do not allow the valve to
ow at least 1.5 gpm.
Control handle ON-OFF
Adjust water temperature
HOT
COLD
OFF
ON
Clean nished area using mild soap
and water or a non-abrasive cleaner
and then quickly
rinse. A non-
abrasive wax may
be used to preserve
nish area.
Care and Cleaning
Tub-Shower Operation
Trim Installation