Installation Guide

6
Installation
9) Install wall elbow (Q) to stub
out pipe. Tighten set screw
to secure.
10) Attach shower arm (B) and
ange (C) to vertical shower pipe
turning clockwise to tighten.
11) Install showerhead (A) to shower
arm (B). Turn clockwise to
tighten.
12) Attach large end of hand shower
hose (S) to hand shower wand
(P). Attach small end of hand
shower hose (S) to in-line
vacuum breaker (R). Connect in-
line vacuum breaker to wall
elbow (Q). Turn clockwise to
tighten.
1
2
B
C
3
1
4
2
S
P
R
S
Q
1
2
Q
1
2
A
B
Operation & Maintenance (Temperature Control)
1) Turn shower handle counter-
clockwise approximately 1/4 turn
to put valve in cold position.
2) Turn shower handle counter-
clockwise approximately 1/2 turn
to put valve in warm position.
3) Turn shower handle counter-
clockwise approximately 3/4 turn
to put valve in hot position.