Installation Guide

5
Installation
Operation (Temperature Control)
1) Turn shower handle counter-
clockwise approximately 1/4 turn
to put valve in cold position.
2) Turn shower handle counter-
clockwise approximately 1/2 turn
to put valve in warm position.
3) Turn shower handle counter-
clockwise approximately 3/4 turn
to put valve in hot position.
1
3
C
4
U2
U3
U1
U2
2
Note: For dry wall 1/2" thick or less,
insert anchor tool (U3) into drywall
anchor (U2) to secure behind wall
prior to installing wall cradle.
9) Place mounting plate
(C)
in po-
sition, mark and drill 3/16" holes
for tile anchors (U1), 5/16" holes
for drywall anchors (U2). Install
anchors.
10) Remove cover of hand show-
er cradle
(E)
. Install cradle and
mounting plate
(C)
. Secure with
three screws
(F)
. Replace cover
on hand shower cradle.
1
2
4
E
F
C
3
11) Attach vacuum breaker (G) to wall
ell (B). Attach hose (H) to vacuum
breaker. Attach hand shower (A)
to hose (H). Turn clockwise to
tighten.
5
3
1
2
4
A
H
H
G
B
T
1
2
12) Install tub spout (T) to pipe ī€˛tting
Turn clockwise to tighten.