Installation Guide

Symmons Industries, Inc. 31 Brooks Drive Braintree, MA 02184 Phone: (800) 796-6667 Fax: (800) 961-9621
Copyright © 2021 Symmons Industries, Inc. symmons.com gethelp@symmons.com ZV-3466 REV B 031622
Installation
1
5
3
7
6
8
4
2
9
11
10
13
Section A (Steps 1-10)
1. Slide straps in mounting tabs
2. Attach strap to studs with user provided screws
3. Secure valve to box with two supplied nuts
4. Glue 2’’ PVC pipe into bottom of drain box
5. Knockout outside two holes of supply box for hot and
cold supply (shown in A.1)
6. Insert provided screws through tabs to secure box in
place
7. Connect supplies to valves with either:
a. Sweat connect
b. Included PEX Adapter connection that requires
thread sealant
8. If condensate drain is used, knockout back hole in
drain box (shown in A.1)
9. Knockout center plug of drain box with screwdriver
or hammer and use pliers to remove
Section B (Steps 10&11)
10 After finish wall is in place, press on covers
a. If finish wall is 1/2’’ thick, break tabs from cover
o
b. If 2 layers of 5/8” drywall leave tabs on
Funnel Installation:
Before installation of funnel deburr drain hole as necessary
11. If 1-1/4’’ drain line hose used, use provided clamp to
secure hose in place
Section C (Step 12)
Double Bay Installation:
12. Mount boxes on adjacent side of wall stud with
provided tabs. Continue steps starting at step 4.
Section D (Step 13)
Surface Mount Installation:
13. Drill holes out of box and use user provided screws
to attach to wall
Section A
Section B
Section A.1
Section C
Section D
12
8
5