Installation Guide

4
Installation
Note:
For valve body installation, please
see valve body installation guide.
1) Install secondary integral
diverter (O) into shower
escutcheon (M).
2) I
nstall shower escutcheon (M) to
shower valve. Secure with two
screws (L).
3) Install dome cover (K) to valve and
secure with lock nut (J).
4) Install handle (H) to valve and
secure with screw (I) and star
washer (G).
Attach plug
button (F) to handle.
Note: Handle should be facing the
6 o'clock position.
5) Install tub spout (P) to pipe
tting. Turn clockwise to secure.
6) Install wall elbow (B) to stub out
pipe. Turn clockwise to tighten.
7) Place cradle mounting plate
(E)
in
position, mark and drill 1/8" pilot
holes into stud.
Option:
Place cradle mounting
plate
(E)
in position, mark and drill
3/16" holes into wall. Install anchors.
8) Remove cover of hand shower
cradle
(C)
. Install cradle and
mounting plate
(E)
. Secure with
three screws
(D)
. Replace cover
on hand shower cradle.
O
M
1
2
L
M
1
2
B
1
3
2
E
1
2
3
G
H
F
I
1
2
P
4
E
D
C
2
1
1
2
E
1
K
J
Symmons Industries, Inc. 31 Brooks Drive Braintree, MA 02184 (800)796-6667 Fax: (800)961-9621
©2014 Symmons Industries, Inc.
www.symmons.com
gethelp@symmons.com
ZV-3075 REV 0 06/16/2014