Installation Sheet

5
FIGURE 8.5
8. Installation - Shower Valve Trim
2) Secure large shower escutcheon to Temptrol
pressure balancing valve using mounting screws. Guide
handle into control port on valve body (FIGURE 8.2).
3) Snap dial into large shower escutchon (FIGURE 8.3).
4) Install dome cover by turning clockwise (FIGURE 8.4).
5) Install handle to shower valve.
Secure handle with
star washer and screw. Attach plug button to handle
(FIGURE 8.5).
FIGURE 8.2
FIGURE 8.1
FIGURE 8.3
1) Attach arm and flange to shower pipe. Turn clockwise
to tighten (FIGURE 9.1).
2) Install showerhead to shower arm. Turn clockwise to
tighten (FIGURE 9.2).
9. Installation - Showerhead & Tub Spout
1) Place diverter/volume control handle into slot in shower
escutcheon (FIGURE 8.1).
3) Install tub spout to stub out pipe. Turn clockwise to
tighten (FIGURE 9.3).
FIGURE 8.4
FIGURE 9.1
FIGURE 9.2
FIGURE 9.3