Installation Guide

3
Installation / Tools Required
Water lines MUST be thoroughly ushed BEFORE and AFTER installing the faucet to prevent foreign matter i.e.
copper chips, sand, stones, etc. from clogging and possibly damaging the sealing surfaces of the cartridge.
Notes: 1) Recommended minimum operating water supply pressure is 40 psi.
2) Supply stop valves must have 3/8" O.D. compression outlet.
1
2
U
V
W
1
2
3
3
1) Remove compression nuts (U) and
ferrules (V) from supply stops. Install
check/screen assemblies (W) to
supply stops.
2) Install faucet (I), threaded rods (M),
mounting gasket (Q), and 3/8" copper
tubing (P) to deck surface.
M
1
3
R
2
S
T
4
3) Place mounting brackets (R) and
spacers (S) onto threaded rods (M).
Secure hardware by tightening
mounting nuts (T) clockwise.
3
3
1
2
U
P
V
W
2
A
J
1
3
4
5) Remove aerator (J). Turn handle (A)
to full cold position. Open supply,
holding down handle for 10 seconds.
Rotate handle to full hot position,
open supply and repeat above
procedure. Hold down handle and
rotate from left to right to ush lines
completely.
6) After faucet has been operated
through a number of cycles, and sup-
ply water temperature is at desired
levels, adjustments to these features
can be made (see page 4).
I
M
Q
P
Important: DO NOT REMOVE tape
on copper tubing.
Adjustable Wrench Allen Wrench: 2.5 mm
Phillips Head Screwdriver Plumber Tape
4) Connect compression nuts (U) and
ferrules (V) to copper tubing (P).
Carefully bend copper tubing (P) to
meet check/screen assemblies (W).
Attach compression nuts to check/
screen assemblies.